ATPL-5106(010) 40th Street Transit and Multi-Modal Enhancements Project

2 Documents in Project

Summary

SCH Number
2025110887
Lead Agency
City of Emeryville
Document Title
ATPL-5106(010) 40th Street Transit and Multi-Modal Enhancements Project
Document Type
NOD - Notice of Determination
Received
Posted
3/27/2026
Document Description
Project Description: The project would enhance existing infrastructure on 40th Street (Adeline Street to IKEA Entrance) and Shellmound Street (IKEA Entrance to Christie Avenue) through the construction of 1.4 miles of two-way separated Class IV bikeway, transit-only lanes, transit islands, pedestrian enhancements, a transit hub with complete street intersection improvements, and closing the unsignalized intersections of Hubbard Street and Haven Street on the north side of 40th Street, partial southbound closures at the unsignalized intersections of Holden Street and Watts Street on the north side of 40th Street per the Emeryville City Council Resolution 23-105, 23-106, 23-107, and 23-108 (July 18, 2023). Project features would consist of realigning the existing lanes, removing and replacing medians, rehabilitating the pavement surface, restriping, installing green stormwater infrastructure improvements, upgrading street lighting, and reconstructing pedestrian infrastructure to accommodate a two-way separated Class IV bikeway, new sidewalk, and concrete bus pads. 40th Street (Adeline Street to IKEA Entrance) improvements would include: • Lane realignment to accommodate two-way separated Class IV bikeway on the north edge of the roadway. • Thin grind and asphalt concrete overlay. • Asphalt concrete conforms adjacent to new concrete work. • Full depth pavement reconstruction in areas of new islands for bikeway separation. • Removal of existing roadway improvements as needed. • Construction of sidewalk on Hubbard Street. • Multi-use pathway connection between Hubbard Street and Halleck Street up to 4.5 feet in height. • Addition of concrete bus pads at bus stops. Shellmound Street (IKEA Entrance to Christie Avenue) improvements would include: • Lane realignment to accommodate two-way separated Class IV bikeway on the west edge of the roadway. • Thin grind and asphalt concrete overlay. • Asphalt concrete conforms adjacent to new concrete work. • Roadway improvements, including excavation to a maximum depth of one foot below existing grade. • Addition of one concrete bus pad at one bus stop.

Contact Information

Name
Ryan O’Connell
Agency Name
City of Emeryville
Job Title
Senior Civil Engineer
Contact Types
Lead/Public Agency / Project Applicant

Location

Cities
Emeryville
Counties
Alameda
Regions
Citywide
Cross Streets
Shellmound Street and 40th Street between Christie Avenue and Adeline Street
Zip
94608
Parcel #
City ROW
State Highways
I-580, I-80, I-880, SR-24
Railways
Amtrak
Schools
East Bay German International, Emery High School
Waterways
San Francisco Bay
Township
1S
Range
4W
Section
21-23
Base
OakWest

Notice of Determination

Approving Agency
City of Emeryville
Approving Agency Role
Lead Agency
Approved On
County Clerk
Alameda
Final Environmental Document Available at
https://www.emeryville.org/Government/Departments/Public-Works

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV New Search Print