Sly Park Recreation Area Boat Launching Facilities Upgrade Project
2 Documents in Project
Summary
SCH Number
2025110464
Public Agency
El Dorado Irrigation District
Document Title
Sly Park Recreation Area Boat Launching Facilities Upgrade Project
Document Type
NOE - Notice of Exemption
Received
Posted
11/13/2025
Document Description
The El Dorado Irrigation District (District) proposes to make improvements at two boat launch facilities (BLFs) within the Sly Park Recreation Area (SPRA) located in the community of Pollock Pines. The project involves accessibility upgrades to comply with Americans with Disabilities Act (ADA) standards including installation of ADA compliant restrooms, parking stalls, and fish cleaning stations at each BLF. The project would also increase safety for boaters and anglers by widening the boat ramp at the Doolittle BLF to provide multiple launch lanes at lower lake levels, widening the launch ramp turnaround at the Stonebraker BLF, installing lighting at both BLFs and restrooms, and installing animal-resistant garbage enclosures. The project is also intended to decrease wait times for launching, providing facilities commensurate with SPRA’s boating visitation, and updating signage to provide boating safety and aquatic invasive species information.
The District proposes to complete the necessary improvements to the BLFs in three phases over a period of multiple years as follows:
• Phase 1 - Doolittle BLF: Widen the boat ramp to provide a total of three launch lanes at lower lake levels
• Phase 2 - Doolittle BLF: Replace the vault restroom, add an ADA-compliant vehicle-trailer parking stall, install a fish cleaning station, create an ADA-compliant path of travel, chip seal and re-stripe the parking area, add security lighting, install bear resistant garbage enclosures, and install an information kiosk and project signage
• Phase 3 - Stonebraker BLF: Widen the boat ramp upper turnaround, replace the vault restroom, add chip seal and re-stripe the parking area, replace the fish cleaning station, install solar lighting, install bear resistant garbage enclosures, and install an information kiosk and project signage
The following equipment would be necessary to complete the project:
• Excavator
• Dump Truck
• Barge
• Work Truck
• Front Loader
• Crane
• Flat Bed Truck
• Sweeper
• Generator
• Cement Truck
• Suction Pump
• Cement Mixer
• Cement Pump
• Miscellaneous Hand Tools
Phase 1 activities to widen the boat ramp at the Doolittle BLF will involve work below the ordinary high-water mark of Jenkinson Lake and may also involve in-water work depending on the lake elevation at the time of construction. Activities would include excavation of silt and debris from the area where the new boat launch lanes will be constructed. Once excavation is complete crews would install concrete matting to form the boat launch lanes and add riprap along the end to stabilize the structure. A new concrete anchor would be installed to guide the floating dock as water levels fluctuate. Work would be performed from a floating barge and/or long reach excavator from the shoreline. A silt curtain will be installed around the work area in the reservoir to help contain turbidity generated during construction activities. Phase 1 project activities would be scheduled to begin in the fall when the reservoir is at its lowest elevation and when recreational use at the SPRA is typically low.
Phase 2 and 3 activities would involve adding ADA-compliant amenities (i.e., vehicle-trailer parking, vault restrooms), installing a fish cleaning station, applying chip seal and striping to parking areas with ADA-compliant paths of travel, adding security lighting, installing bear resistant garbage enclosures, and installing an information kiosk and project signage. Activities would include demolition of old components, installation of new infrastructure, and finishing work (e.g., paving and striping), Phase 2 project activities would be scheduled to begin in the fall when recreational use at the SPRA is typically low.
Contact Information
Name
Michael C. Baron
Agency Name
El Dorado Irrigation District
Job Title
Environmental Review Analyst
Contact Types
Lead/Public Agency
Phone
Email
Location
Coordinates
Cities
Unincorporated - Pollock Pines
Counties
El Dorado
Regions
Unincorporated
Cross Streets
Sly Park Road and Lakewood Drive
Zip
95726
Total Acres
1
Parcel #
042011016
State Highways
NA
Railways
NA
Airports
NA
Schools
NA
Waterways
Sly Park Lake
Township
10N
Range
13E
Section
9 & 18
Base
Sly Park
Other Location Info
Located with in the Sly Park Recreation Area
Notice of Exemption
Exempt Status
Categorical Exemption
Type, Section or Code
CCR, Title 14, Sec. 15301, 15303
Reasons for Exemption
The project qualifies for a Class 1 CEQA Categorical Exemption as the maintenance and repair of existing facilities involving negligible or no expansion of use (CEQA Guidelines §15301) and for a Class 3 CEQA Categorical Exemption for new construction of small structures (CEQA Guidelines §15303).
County Clerk
El Dorado
Attachments
Notice of Exemption
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.