Jesmond Dene (John Masson Memorial) Bike Park

Summary

SCH Number
2025101325
Lead Agency
City of Escondido
Document Title
Jesmond Dene (John Masson Memorial) Bike Park
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
Park, Open Space/Parks Zone with a Public Land/Open Space General Plan designation.
Document Description
The John Masson Bike Park project site is approximately 4.6 acres and located within the existing 40-acre Jesmond Dene Park, situated at the southwest corner of North Broadway and Jesmond Dene Road (Figure 1, Regional Location, and Figure 2, Aerial Photograph). The project would create a progression-based bike park on an undeveloped portion of parkland that is informally used by the community for off-road recreational bike activities (Figure 3, Improvement Plan). The resulting bike park would include a pump and jump track, a skill track, and a kids track. The bike park would also include viewing areas benches, and a multi-use trail around a portion of the bike park perimeter. The proposed bike park would provide a safe, designated place for users to practice and develop their bike skills. As the project site is currently used informally for off-road recreational bike activities, it is anticipated that informal users already using the park for these activities would utilize the bike park, along with a minor increase in users once the developed bike park is completed. These users may already be utilizing the park for other recreational purposes. Unique, new users would not constitute a large increase in park usage. The design for the proposed bike park is based on input from various community stakeholders, including City staff, park users, and the local community. The bike park would be constructed with high-quality materials to minimize maintenance and ensure durability and longevity. The facility would be for daytime use only; no overhead or wayfinding lighting is proposed. Project construction is anticipated to begin in Winter 2026 with site preparation. Construction of the project is expected to occur over a period of four months and is anticipated to be completed around Fall 2026. Construction activities include demolition, grading, paving and landscaping. Grading quantities consist of the import of 2,255 cubic yards of fill to construct jumps and berms. Construction equipment expected to be utilized during demolition and construction would be typical of similar construction activities and may include equipment such as a backhoe, front-loader, excavator, dump trucks, equipment trucks, air compressors, hydraulic pumps, asphalt boom pump trucks, and asphalt/concrete delivery trucks.

Contact Information

Name
Oscar Romero
Agency Name
City of Escondido
Job Title
Principal Planner
Contact Types
Lead/Public Agency

Name
Kim Baranek
Agency Name
Baranek Consulting Group
Job Title
Principal/Senior Project Manager
Contact Types
Consulting Firm

Location

Cities
Escondido, San Marcos
Counties
San Diego
Regions
Citywide, Countywide
Cross Streets
Jesmond Dene Road, North Broadway
Zip
92026
Total Acres
40
Parcel #
18731009, 18731011
State Highways
I-15
Railways
N/A
Airports
N/A
Schools
Reidy Creek Elementary
Township
11
Range
2 W
Section
33
Base
San Bern

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Conservation (DOC), California Department of Fish and Wildlife, South Coast Region 5 (CDFW), California Department of Forestry and Fire Protection (CAL FIRE), California Department of Parks and Recreation, California Department of Toxic Substances Control (DTSC), California Department of Transportation, District 11 (DOT), California Department of Water Resources (DWR), California Fish and Game Commission (CDFGC), California Governor's Office of Emergency Services (OES), California Highway Patrol (CHP), California Native American Heritage Commission (NAHC), California Natural Resources Agency, California Regional Water Quality Control Board, San Diego Region 9 (RWQCB), California San Diego River Conservancy (SDRC), Colorado River Board, Office of Historic Preservation, State Water Resources Control Board, Division of Drinking Water, State Water Resources Control Board, Division of Water Rights, State Water Resources Control Board, Divison of Financial Assistance
Development Types
Recreational (Bike Park)
Local Actions
Site Plan
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Geology/Soils, Greenhouse Gas Emissions, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Transportation, Tribal Cultural Resources
Public Review Period Start
Public Review Period End

Attachments

Download CSV Download All Attachments New Search Print