T-TSA Digestion Improvements Project
2 Documents in Project
Summary
SCH Number
2025101323
Lead Agency
Tahoe-Truckee Sanitation Agency
Document Title
T-TSA Digestion Improvements Project
Document Type
NOD - Notice of Determination
Received
Posted
2/5/2026
Document Description
T-TSA is proposing improvements to their process and comfort heating facilities at their Water Reclamation Plant (WRP). The existing steam boilers have reached the end of their useful life and require replacement. T-TSA is proposing to replace the existing steam boilers with a new heating and energy recovery system that is more efficient and reliable, reduces long-term O&M, and provides flexibility to accommodate future demands and processes. The project would include new hydronic boilers, a new boiler building, a new access road, new digester gas conditioning equipment for the new boiler system, and replacement of existing facilities associated with the existing process and comfort heating system, including piping systems, electrical equipment, and instrumentation and controls.
Contact Information
Name
Scott Fleming
Agency Name
Tahoe-Truckee Sanitation Agency
Job Title
Senior Engineer
Contact Types
Lead/Public Agency
Phone
Email
Location
Coordinates
Cities
Truckee
Counties
Nevada
Regions
Northern California
Cross Streets
13720 Butterfield Drive
Zip
96161
Total Acres
1
Parcel #
049-330-005-000
State Highways
I-80, Hwy 267
Railways
UPPR
Airports
Truckee Tahoe Airport
Schools
Glenshire Elementary School
Waterways
Truckee River
Notice of Determination
Approving Agency
Tahoe-Truckee Sanitation Agency
Approving Agency Role
Lead Agency
Approved On
County Clerk
Nevada
Final Environmental Document Available at
13720 Butterfield Drive, Truckee, CA 96161
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.