930 Commercial Street Project
2 Documents in Project
Summary
SCH Number
2025101222
Lead Agency
City of San Carlos
Document Title
930 Commercial Street Project
Document Type
NOD - Notice of Determination
Received
Posted
4/22/2026
Document Description
The proposed project includes the removal of the two (2) existing single-story industrial buildings and asphalt parking lots, in order to construct a new one-story, 48,370-square-foot automobile repair facility with associated surface parking and landscaping improvements. The facility would be designed to service and maintain a fleet of corporate gasoline-powered, light-duty vehicles, featuring a variety of amenities and spaces geared towards the industrial use. The ground floor of the facility (43,604 square feet) would include thirty (30) car storage spaces, three (3) flat stalls, four (4) lift bays, two (2) wash bays, a detail bay, a smog bay, mechanic bay, alignment bay, workshop, open work space, tire changing area, oil storage, building storage, temporary storage, open tool storage, office room, fabrication room, main electrical room, plumbing room, break room, vehicle history room, IT/minimum point of entry (MPOE) room, laundry/janitorial room, equipment room, parts wash and media blasting room, trash room, technical library room, reverse osmosis room, fuel shed, unisex restrooms, foyer, fire extinguisher cabinets, and fire hose cabinets. The mezzanine floor of the facility (4,766 square feet) would include mezzanine space, guard railing, and a roof access hatch.
Contact Information
Name
Laura Richstone
Agency Name
City of San Carlos
Job Title
Senior Planner
Contact Types
Lead/Public Agency
Phone
Name
Harvey Koo
Agency Name
930 Commercial Street LLC
Job Title
Applicant
Contact Types
Project Applicant
Phone
Location
Coordinates
Cities
San Carlos
Counties
San Mateo
Regions
San Francisco Bay Area
Cross Streets
Commercial Street and Industrial Road
Zip
94070
Total Acres
1.69
Jobs
8
Parcel #
046-161-030
State Highways
US 101, I-280, SR-82
Railways
Caltrain, San Carlos Station
Airports
San Carlos Airport
Schools
Arroyo Elementary School, Central Middle School
Waterways
Pulgas Creek, Cordilleras Creek, San Francisco Bay
Township
5S
Range
4W
Section
12
Base
MDBM
Notice of Determination
Approving Agency
City of San Carlos
Approving Agency Role
Lead Agency
Approved On
County Clerk
San Mateo
Final Environmental Document Available at
City of San Carlos, 600 Elm Street, San Carlos, CA 94070
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.
