AB Pipeline Replacement Project

2 Documents in Project

Summary

SCH Number
2025101044
Lead Agency
Vista Irrigation District
Document Title
AB Pipeline Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
2/12/2026
Document Description
The project consists of the replacement of an existing 1,700-linear foot (LF) Vista Irrigation District (VID) gravity powered water pipeline in the City of San Marcos and unincorporated San Diego County. The existing 14-inch-diameter pipeline is located primarily underground with portions located aboveground. The existing pipeline would be removed or abandoned and replaced with an 18-inch-diameter gravity powered pipeline. Although the project would replace an existing 14-inch pipe with an upsized 18-inch pipe, it would have the same water supply capacity and would maintain flows for existing and planned development in the area. The project would not substantially increase water flows in the area and would not require the expansion of associated VID infrastructure. Future development proposing connections to VID infrastructure would be required to undergo separate review by VID to ensure capacity to accommodate proposed water flows. Three potential project alignment options are being considered for replacing VID’s existing AB pipeline. The three project alignment options being considered are the Existing Alignment, SE10 Alternative Alignment, and Road Alternative Alignment options. For the purposes of this Initial Study, all three alignments are analyzed individually for each issue area to assess the potential environmental impacts of each option; however, the Road Alternative Alignment Option is the preferred option. Existing Alignment Option If the Existing Alignment Option is chosen, the project would replace the existing 1,700-LF AB pipeline at its current location or abandon the pipeline and construct a new 1,700-LF pipeline adjacent to the existing alignment, within the 20-foot-wide existing VID utility easement for the AB pipeline. The existing aboveground portions of the pipeline would be removed and replaced with an entirely underground alignment. SE10 Alternative Alignment Option The SE10 Alternative Alignment Option would abandon the existing 1,700-LF AB pipeline and construct a new 1,800-LF pipeline north of the Existing Alignment along the northern boundary of the parcel. The SE10 Alternative Alignment Option would occur partially within a previously recorded, but not utilized, VID 20-foot-wide utility easement. The eastern portions of the alignment would also be located partially within the existing San Diego County Water Authority aqueduct easement. Road Alternative Alignment Option (Preferred) The Road Alternative Alignment Option would abandon the existing 1,700-LF AB pipeline and construct a new 1,720-LF pipeline as follows: the western 1,300-LF portion of the alignment would be within an existing dirt road immediately north and outside of any VID existing utility easements, requiring the recording of a new 20-foot-wide utility easement for this reach; the eastern portion of the alignment would be located within the 20-foot-wide existing VID utility easement for the AB pipeline that crosses the San Diego County Water Authority aqueduct easement.

Contact Information

Name
Christina Olson
Agency Name
Vista Irrigation District
Job Title
Engineering Services Manager
Contact Types
Lead/Public Agency / Project Applicant

Location

Cities
San Marcos
Counties
San Diego
Regions
Countywide
Cross Streets
Esplendido Avenue, Bluebird Canyon Road
Zip
92084
State Highways
SR-78
Schools
Paloma Elementary School

Notice of Determination

Approving Agency
Vista Irrigation District
Approving Agency Role
Lead Agency
Approved On
County Clerk
San Diego
Final Environmental Document Available at
1391 Engineer Street Vista, CA 92081

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.