On-Call Emergency Sewer System Point Repairs and Reconstruction and On-Call Emergency Sewer System Rehabilitation and Sewer Pipe Lining Project
Summary
SCH Number
2025100763
Public Agency
Los Angeles County Department of Public Works
(DPW)
Document Title
On-Call Emergency Sewer System Point Repairs and Reconstruction and On-Call Emergency Sewer System Rehabilitation and Sewer Pipe Lining Project
Document Type
NOE - Notice of Exemption
Received
Posted
10/16/2025
Document Description
The project is to award contracts to provide repair crews, appropriate equipment, and materials to repair sewer system facilities when Public Works crews are unable to respond to an urgent situation or lack the equipment and/or expertise necessary to safely accomplish the work. Utilizing multiple contractors will enable Public Works to respond in a timely manner to urgent repairs that may be needed throughout the Consolidated Sewer Maintenance District (CSMD) and Marina Del Rey District. Both Districts are administered by the County of Los Angeles Department of Public Works. The Districts system serves greater than one-half of a million parcels and a population of over 2 million people within the unincorporated areas of the County, 38 cities, and 3 contract cities. The Districts system includes over 4,600 miles of sanitary sewers, 155 pump stations, and 4 wastewater treatment plants.
Contact Information
Name
Kristy Kim
Agency Name
Los Angeles County Public Works
Job Title
Civil Engineer
Contact Types
Lead/Public Agency
Phone
Email
Location
Counties
Los Angeles
Regions
Citywide, Countywide, Unincorporated
Zip
91803
Notice of Exemption
Exempt Status
Categorical Exemption
Type, Section or Code
CA Public Resources Code Section 21065, CEQA 15378(b)
Reasons for Exemption
The award of the contracts and related recommended activity are not a project under Section 21065 of the California Public Resources Code and is activity that is excluded from the definition of a project by Section 15378(b) of the California Environmental Quality Act (CEQA) since it consists of administrative activity of government that will not result in direct or indirect physical changes in the environment. No specific projects are identified in the contracts. Prior to approving NTPs for work to be performed under the agreements as the need for specific activities under the agreements as the need for specific activities under the agreements are identified in the futrue, the Director of Public Works or his designee will determine whether the work is exempt from CEQA, and Public Works will only proceed with such work if it is determined that the exemption applies. To the extent other findings are necessary under CEQA, Public Works will return to the Board for approval of the work along with appropriate CEQA findings.
County Clerk
Los Angeles
Attachments
Notice of Exemption
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.