52 Franklin Avenue Project
2 Documents in Project
Summary
SCH Number
2025100621
Lead Agency
City of South San Francisco
Document Title
52 Franklin Avenue Project
Document Type
NOD - Notice of Determination
Received
Posted
11/24/2025
Document Description
The Project consists of the construction and operation of a residence. The lot slopes uphill from Franklin Avenue. A building footprint is shown on the front two-thirds of the lot. Because the site is limited in developable area, due to the debris capture area and associated 8-foot-wide access path (discussed below), it is anticipated that the Project could require setback variances. The estimated construction schedule is provided in Table 1 of the IS/MND.
As discussed previously, geotechnical engineering and engineering geologic investigations carried out between 1989 and 2025 concluded that the potential for another debris flow exists, derived from susceptible soils on the steeper, upper portions of the property and the hillside above the rear property line. The potential hazard for a new house built on the property, associated with potential future debris flows, would be similar to the 1982 debris flow unless mitigative measures are undertaken (Michelucci & Associates, Inc., 2023).
Geotechnical mitigation measures on the site included as Project design and peer reviewed by Cotton Shires Associates (CSA) as part of this environmental review would consist of constructing a “U” shaped debris barrier, consisting of retaining walls, to form a basin that would capture and enclose a potential debris flow onto the Project site (see Project Description Figure 3 of the IS/MND). The debris flow capture capacity is currently estimated at 543 cubic yards, above the recommendation of 500 cubic yards by the Applicant’s geotechnical consultants (Michelucci and Associates and Earth Systems) and confirmed by the City’s geotechnical consultant, CSA. An 8-foot-wide setback along the western property line would allow access to the debris capture area for equipment to remove debris captured within the basin, as needed.
Contact Information
Name
Billy Gross
Agency Name
City of South San Francisco
Job Title
Principal Planner
Contact Types
Lead/Public Agency
Phone
Email
Name
Mr. Juan Pedro Diaz/Ms. Karen Lisette Diaz
Agency Name
Applicant
Job Title
Private Developer
Contact Types
Project Applicant
Phone
Location
Coordinates
Cities
South San Francisco
Counties
San Mateo
Regions
Citywide
Cross Streets
52 Franklin Avenue
Zip
94080
Total Acres
0.19
Parcel #
012-039-180
State Highways
U.S. Route 101 and 82
Railways
Caltrain/Union Pacific
Airports
SF International Airport
Schools
Martin Elementary School, Ponderosa Elementary School,
Waterways
Colma Creek, San Francisco Bay
Township
3 S
Range
5 W
Base
NDPM
Other Location Info
Sunshine Gardens Elementary School, Parkway Heights Middle School, Spruce Elementary School, Baden High School, Shiloh United School, Los Cerritos Elementary School, South San Francisco High School, Saint Veronica Catholic School, Parkside Day School, El Portal School.
Notice of Determination
Approving Agency
City of South San Francisco Planning Commission
Approving Agency Role
Lead Agency
Approved On
County Clerk
San Mateo
Final Environmental Document Available at
315 Maple Avenue, South San Francisco, CA 94080
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.
