AVAIO Pittsburg Backup Generating Facility
Summary
SCH Number
2025100607
Lead Agency
California Energy Commission
Document Title
AVAIO Pittsburg Backup Generating Facility
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
Present- Technology Park / Zoning- Planned Development / General Plan Designation- Employment Center Industrial
Document Description
AVAIO Infrastructure (applicant) is proposing to construct and operate the AVAIO Pittsburg Backup Generating Facility to provide emergency backup power to the proposed Pittsburg Data Hub. Collectively, the PBGF and the PDH comprise the “project.” The main component of the PDH would be a three-story 347,740 square foot data center building that would house computer servers for private clients in a secure and environmentally controlled structure. The data center building would consist of two main components; the data center suites that would house client servers, and the administrative facilities including support facilities such as the building lobby, restrooms, conference rooms, landlord office space, customer office space, loading dock and storage. The data center suite components would consist of three levels of data center space. Each level would contain two (2) data center suites and corresponding electrical/uninterruptible power supply rooms. The data center is being designed with an average rack power rating of 10 kilowatts (kW). The data center is expected to have between 20 and 30 employees and 12-15 visitors (including deliveries) visit the site per day. The PBGF would be an emergency backup generating facility with a generation capacity of up to 92 MW to support the need for the data center to provide uninterruptible power supply for its tenants’ servers. The PBGF would consist of thirty-seven (37) 3-MW diesel-fired backup generators arranged in a generation yard located on the west side of the PDH. Thirty-six (36) of the generators would be dedicated to replace the electricity needs of the data center in case of a loss of utility power, and one of the generators would be used to support general office loads along with building and life safety services (house generator).
Contact Information
Name
Ali.Jahani
Agency Name
California Energy Commission
Job Title
Senior Environmental Planner
Contact Types
Lead/Public Agency
Phone
Email
Location
Coordinates
Cities
Pittsburg
Counties
Contra Costa
Regions
Citywide
Cross Streets
Golf Club Rd and W Leland Rd
Zip
94565
Total Acres
22.31
Jobs
150
Parcel #
095-160-001 and 095-160-002
State Highways
4
Railways
Main sub network
Airports
None
Schools
Various, see attached
Waterways
Various, see attached
Notice of Completion
State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Conservation (DOC), California Department of Fish and Wildlife, Bay Delta Region 3 (CDFW), California Department of Fish and Wildlife, Marin Region 7 (CDFW), California Department of Forestry and Fire Protection (CAL FIRE), California Department of Parks and Recreation, California Department of Toxic Substances Control (DTSC), California Department of Transportation, District 4 (DOT), California Department of Transportation, Division of Transportation Planning (DOT), California Department of Water Resources (DWR), California Energy Commission, California Governor's Office of Emergency Services (OES), California Highway Patrol (CHP), California Native American Heritage Commission (NAHC), California Natural Resources Agency, California Public Utilities Commission (CPUC), California State Lands Commission (SLC), Delta Protection Commission, Delta Stewardship Council, Office of Historic Preservation, San Francisco Bay Conservation and Development Commission (BCDC), State Water Resources Control Board, Division of Drinking Water, State Water Resources Control Board, Division of Water Quality
Development Types
Other (Data hub and backup generating facility,up to 92 megawatts (MW)), Power:Other Power Type (Backup generating facility)(Megawatts 92)
Local Actions
Site Plan
Project Issues
Aesthetics, Air Quality, Biological Resources, Cultural Resources, Drainage/Absorption, Economics/Jobs, Energy, Fiscal Impacts, Geology/Soils, Greenhouse Gas Emissions, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mandatory Findings of Significance, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Sewer Capacity, Solid Waste, Transportation, Tribal Cultural Resources, Utilities/Service Systems, Vegetation, Wildfire
Public Review Period Start
Public Review Period End
Attachments
Draft Environmental Document [Draft IS, NOI_NOA_Public notices, OPR Summary Form, Appx,]
Notice of Completion [NOC] Transmittal form
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.