CARATAN GROUNDWATER RECHARGE FACILITY AND FUTURE RECHARGE FACILITIES PROJECT
Summary
SCH Number
2025100500
Lead Agency
Southern San Joaquin Municipal Utility District
Document Title
CARATAN GROUNDWATER RECHARGE FACILITY AND FUTURE RECHARGE FACILITIES PROJECT
Document Type
NOD - Notice of Determination
Received
Posted
10/10/2025
Document Description
The District proposes constructing the 160-acre Caratan Recharge Facility and 520-acres of Future Recharge Facilities, which would convert a total of approximately 680 acres of previously irrigated crops into recharge ponds. The project would use existing District conveyance infrastructure to the extent possible; however, the Caratan Facility would require installing a 0.2-mile pipeline along Woollomes Avene to connect the proposed recharge basin to the FKC. Additional conveyance infrastructure may be needed for the Future Recharge Facilities; however, these projects are still in the planning phase, therefore, this information is unknown at this time.
The Caratan Facility would have a water-saving capacity of 5,560 acre-feet per year with a 10-year average annual capacity of 55,600 acre-feet to recharge groundwater with surface water. The Future Recharge Facilities would have a water-saving capacity of 15,920 acre-feet per year with a 10-year average annual capacity of 159,200 acre-feet to recharge groundwater with surface water. The Caratan Facility and Future Recharge Facilities would allow the District to store excess contract water in-District in low-demand months, or during wet-periods, for use in high-demand months, or during dry months when water availability is limited. Additionally, the ability to recharge an additional 21,480 acre-feet per year would help meet the District’s goals identified in the Kern County Subbasin Groundwater Sustainability Plan (GSP) and support the Kern County Subbasin in reaching sustainability by 2040.
Contact Information
Name
Roland Gross
Agency Name
Southern San Joaquin Municipal Utility District
Job Title
General Manager
Contact Types
Lead/Public Agency
Phone
Email
Location
Coordinates
Cities
unincorporated
Regions
Countywide
Cross Streets
Woollomes Avenue and Zachary Avenue
Total Acres
680
State Highways
SR 99
Railways
None
Airports
None
Schools
None
Waterways
Lake Woollomes
Township
25S
Range
26E
Section
20, 21
Notice of Determination
Approving Agency
Southern San Joaquin Municipal Utility District
Approving Agency Role
Lead Agency
Approved On
County Clerk
Kern
Final Environmental Document Available at
ssjmud.org
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.