Coral Street Pump Station Electrical Relocation Project
2 Documents in Project
Summary
SCH Number
2025100106
Lead Agency
Monterey One Water
Document Title
Coral Street Pump Station Electrical Relocation Project
Document Type
NOD - Notice of Determination
Received
Posted
9/16/2026
Document Description
Monterey One Water ("M1W) owns and operates a coastal subterranean wastewater pump station referred to as the Coral Street Pump Station ("Pump Station") in the City of Pacific Grove, California. Due to proximity to the sea, the Pump Station is vulnerable to sea level rise and storm surge. Both of these events increase the potential for damage or failure of the electrical equipment due to seawater inundation and increase the risk of sanitary sewage overflows ("SSO") into the adjacent marine environment. The Coral Street Pump Station Electrical Relocation Project ("Proposed Project") consists of the relocation of the Pump Station's electrical equipment to address concerns regarding sea level rise. Specifically, the Proposed Project consists of three (3) components described below:
1. Existing Pump Station Improvements;
2. Electrical Equipment Relocation; and
3. Electrical Conduit Duct Bank Installation.
The purpose of the Proposed Project is to enhance the Pump Station's reliability during large storms and flood events.
Contact Information
Name
Jennifer Gonzalez
Agency Name
Monterey One Water
Job Title
CIP Manager
Contact Types
Lead/Public Agency / Project Applicant
Phone
Email
Location
Coordinates
Cities
Pacific Grove
Counties
Monterey
Regions
Southern California
Cross Streets
Ocean View Boulevard, Coral Street, Del Monte Boulevard, and Crest Avenue
Zip
93940
Total Acres
.09
Parcel #
006-021-099-000, 006-101-001-000, Public Right of Way
State Highways
SR 68
Waterways
Pacific Ocean
Township
T15S
Range
RO1W
Section
11, 14
Notice of Determination
Approving Agency
Monterey One Water
Approving Agency Role
Lead Agency
Approved On
County Clerk
Monterey
Final Environmental Document Available at
5 Harris Court, Building D, Monterey, CA 93940
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.
