Bridge Preventive Maintenance Program (BPMP) Group 5 Project

2 Documents in Project

Summary

SCH Number
2025091296
Lead Agency
Tulare County
Document Title
Bridge Preventive Maintenance Program (BPMP) Group 5 Project
Document Type
NOD - Notice of Determination
Received
Posted
1/29/2026
Document Description
The purpose of the Project is to extend the service life of 17 bridges within the County considered to be in generally good condition. Preventative maintenance activities are needed to provide improved safety and operations on each facility. The proposed Project would implement preventive maintenance measures primarily consisting of scour protection repairs and other miscellaneous work including but not limited to deck treatment, spall repair, structural connection repairs, joint repairs, bridge bearing repairs, and overlay (asphalt concrete) removal. Erosion control will be placed where necessary and disturbed areas will be revegetated. Temporary road closures and detours will take place at select bridge sites. The anticipated duration of the road closures will be approximately 4-6hours depending upon access needs of residents and available detour options. Temporary construction easements (TCEs) and partial right-of-way (ROW) will likely be needed on a limited basis to accommodate the construction of the proposed preventative maintenance activities. Construction at all bridge locations is expected to be completed in approximately 12 months.

Contact Information

Name
Gary Mills
Agency Name
County of Tulare, Resource Management Agency
Job Title
Chief Planner
Contact Types
Lead/Public Agency

Name
Jessica Wills
Agency Name
County of Tulare, Resource Management Agency
Job Title
Environmental Planner
Contact Types
Lead/Public Agency

Name
Carlos Gonzalez
Agency Name
County of Tulare, Public Works
Job Title
Project Engineer
Contact Types
Lead/Public Agency / Project Applicant

Location

Cities
unincorporated area
Counties
Tulare
Regions
Unincorporated
Other Location Info
within the Tulare County

Notice of Determination

Approving Agency
TULARE COUNTY BOARD OF SUPERVISORS
Approving Agency Role
Lead Agency
Approved On
County Clerk
Tulare
Final Environmental Document Available at
Tulare County Resource Management Agency, 5961 S Mooney Blvd., Visalia CA 93277.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.