2025 BHPP Sump Repair

Summary

SCH Number
2025090985
Public Agency
California Department of Water Resources (DWR)
Document Title
2025 BHPP Sump Repair
Document Type
NOE - Notice of Exemption
Received
Posted
9/22/2025
Document Description
San Joaquin Field Division plans to remove sediment and debris from three sumps to allow storage of water. To complete this work, a grader, loader, bulldozer, backhoe, and dump truck would be used to remove and move sediment. A water truck will be used to control dust and aid in compaction. Dirt excavated from inside the sump would be placed on the sump roads and compacted. All damaged culverts would be replaced. All staging will take place at the Badger Hill Pumping Plant. All work will take place within the DWR right-of-way. This work is necessary to maintain the sumps and to bring them back to their original condition.

Contact Information

Name
Elizabeth Maldonado
Agency Name
Department of Water Resources, San Joaquin Field Division
Job Title
Senior Environmental Scientist (Specialist)
Contact Types
Lead/Public Agency

Location

Cities
Avenal
Counties
Kings
Regions
Unincorporated

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
15301 (b)
Reasons for Exemption
This project consists of maintenance activities that support the function of the California Aqueduct and water delivery within the State Water Project.

Attachments

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV New Search Print