Walnut Valley Unified School District Electronic Billboard Project
2 Documents in Project
Summary
SCH Number
2025090910
Lead Agency
City of Diamond Bar
Document Title
Walnut Valley Unified School District Electronic Billboard Project
Document Type
NOD - Notice of Determination
Received
Posted
12/18/2025
Document Description
The applicants request approval to install and operate a dual-faced digital LED billboard on the Walnut Valley Unified School District property at 880 S. Lemon Avenue, in Diamond Bar, immediately north of SR-60. The proposed structure would be approximately 97 feet in total height, consisting of a 90-foot sign with up to 7 feet of decorative architectural features. Each sign face would measure 14 feet high by 48 feet wide and display static images that change every eight seconds.
Contact Information
Name
Rudy Lopez
Agency Name
City of Diamond Bar
Job Title
Assistant Planner
Contact Types
Lead/Public Agency
Phone
Email
Name
Matthew Torres
Agency Name
Walnut Valley Unified School District
Job Title
Assistant Superintendent
Contact Types
Project Applicant
Phone
Email
Name
Andy Goodman
Agency Name
Evergreen Media, LLC.
Job Title
President
Contact Types
Project Applicant
Phone
Location
Coordinates
Cities
Diamond Bar
Counties
Los Angeles
Regions
Citywide
Cross Streets
South Lemon Avenue and SR 60
Zip
91789
Total Acres
<1.0 acre
Parcel #
8760-015-901
State Highways
SR 60
Railways
Union Pacific and Metrolink
Schools
Walnut Elementary School
Notice of Determination
Approving Agency
City of Diamond Bar
Approving Agency Role
Lead Agency
Approved On
County Clerk
Los Angeles
Final Environmental Document Available at
https://www.diamondbar.gov/1193/wvusdbillboard
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.
