East Ames-Reche Recharge Facility Project
2 Documents in Project
Summary
SCH Number
2025090734
Lead Agency
Mojave Water Agency
Document Title
East Ames-Reche Recharge Facility Project
Document Type
NOD - Notice of Determination
Received
Posted
12/15/2025
Document Description
The Project consists of the development of two (2) new recharge basins (north and south) on 10 acres surrounded by 12-ft tall berms. Improvements include: an access road surrounding the perimeter of each basin; 6-foot perimeter fencing with barbed wire; a new tee connection within the Winters Road right-of-way; approximately 500 linear feet of 12-inch nonpotable water pipeline from Winters Road to the eastern perimeter of each basin; two (2) headwalls located along the eastern perimeter of each basin connecting to the new nonpotable water pipeline; outlet with energy dissipator; and a nested or multi-completion monitoring well located within the proposed site to monitor infiltration rates, groundwater levels, and water quality. The proposed improvements will allow MWA to increase its groundwater recharge capacity of annual State Water Project Table A allocations. The development of the recharge basins will result in a maximum flow rate of 5 cubic feet per second (cfs) with an anticipated annual recharge capacity of 1,500 AFY.
Contact Information
Name
Melody Bailey
Agency Name
Mojave Water Agency
Job Title
Director of Water Resources
Contact Types
Lead/Public Agency / Project Applicant
Phone
Email
Location
Coordinates
Cities
Landers
Counties
San Bernardino
Regions
Unincorporated
Cross Streets
Winters Rd / Warren Vista Ave
Zip
92285
Total Acres
10
Parcel #
0629-211-13 & 14
State Highways
SR-247
Railways
N/A
Airports
N/A
Schools
N/A
Waterways
Pipes Wash
Township
2N
Range
5E
Section
24
Notice of Determination
Approving Agency
Mojave Water Agency
Approving Agency Role
Lead Agency
Approved On
County Clerk
San Bernardino
Final Environmental Document Available at
Mojave Water Agency, 13846 Conference Center Drive, Apple Valley, CA 92307
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.
