Creek Plan Specific Plan Update
2 Documents in Project
Summary
SCH Number
2025090620
Lead Agency
City of San Marcos
Document Title
Creek Plan Specific Plan Update
Document Type
EIR - Draft EIR
Received
Present Land Use
Mixed Use pursuant to the adopted San Marcos Creek Specific Plan
Document Description
The Creek Plan Specific Plan Update (project) is an update to the adopted San Marcos Creek Specific Plan (2007 Specific Plan) to establish a renewed vision for a distinct, mixed-use district that would serve as the City of San Marcos’ (City) cultural focal point and provide a mix of residential opportunities combining urban living with a connection to nature. Based on the buildout projections of the proposed development districts, the project would provide up to 2,300 dwelling units and a total of 655,856 square feet of commercial space, which would result in a population of 6,831 residents and 1,312 jobs. All future development within the proposed Creek District (Planning Area) would be reviewed for consistency with the project’s Guiding Principles, as well as all relevant goals and policies. The project proposes nine distinct land use districts, each intended to support, as relevant to the district, a cohesive mix of housing, commercial activity, cultural amenities, and open space while maintaining compatibility with surrounding uses. The framework is designed to facilitate a new downtown mixed-use district and an updated approach to creating a more cohesive community with greater open space and integration with San Marcos Creek.
The project includes development standards that would apply to all development projects within the Planning Area, including remodeling and rehabilitation of existing development. The Specific Plan Update establishes quantitative development standards for each land use district, including permitted densities, development areas, maximum building heights, and other land use regulations that guide future development. These standards define the allowable scale and intensity of development, while the subsequent design standards establish the qualitative requirements governing site planning, architecture, landscaping, open space, and sustainability. The project would establish five street categories, each with specified widths, travel lanes, speed limits, and bike lanes. The intent of the project’s proposed mobility improvements is to create a mobility framework that improves internal circulation and connections to existing and planned bike routes, pedestrian walkways, and light rail and regional transit networks. A “park once” approach is encouraged, along with paid and shared parking along certain streets and districts of the Planning Area.
The project includes plans for infrastructure and landscaping improvements, including a proposal for a comprehensive infrastructure and storm water management strategy that addresses longstanding flood constraints within the Planning Area while supporting future development. The City completed construction of flood control improvements in 2024, which resolved most flooding impacts and created new habitat and recreation space. The project identifies design options for a district-wide, multi-benefit naturalized flood conveyance channel to safely convey storm water while improving flood protection and reducing development constraints.
Upon selection of conceptual storm water plans, future development within any property crossed by the channel would be required to prepare detailed engineering plans to support its incremental construction of the improvement plan. Likewise, while the project would establish conceptual designs for the public improvements necessary to serve the Planning Area, detailed engineering design plans would be required in conjunction with individual development applications. Project applicants would prepare improvement plans, as directed by the City, consisting of comprehensive engineering designs and supporting documentation for all circulation and utility infrastructure needed to serve the proposed development. Thoroughfare design would include full streetscape improvements consistent with the standards, design criteria, and guidelines of the Specific Plan Update. Proposed best management practices and project design features are required components of the project and would be implemented as project conditions of approval to minimize project environmental impacts.
Contact Information
Name
Sean del Solar
Agency Name
City of San Marcos
Job Title
Principal Planner/Sustainability Program Manager
Contact Types
Lead/Public Agency / Project Applicant
Phone
Email
Name
Lori Spar
Agency Name
RECON Environmental Inc.
Job Title
CEQA Director
Contact Types
Consulting Firm
Phone
Location
Coordinates
Cities
San Marcos
Counties
San Diego
Regions
Citywide, Southern California
Zip
92069
Total Acres
214
Jobs
1312
Parcel #
Citywide
State Highways
78
Schools
San Marcos Elementary, San Diego Children's Academy
Waterways
San Marcos Creek
Other Location Info
Continuation of Schools: Big Future Preschool, Discovery Isle Preschool
Notice of Completion
State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Coastal Commission (CCC), California Department of Conservation (DOC), California Department of Fish and Wildlife, Marine Region 7 (CDFW), California Department of Fish and Wildlife, South Coast Region 5 (CDFW), California Department of Forestry and Fire Protection (CAL FIRE), California Department of Housing and Community Development (HCD), California Department of Parks and Recreation, California Department of Pesticide Regulation (DPR), California Department of Toxic Substances Control (DTSC), California Department of Transportation, District 11 (DOT), California Department of Transportation, Division of Aeronautics (DOT), California Department of Transportation, Division of Transportation Planning (DOT), California Department of Water Resources (DWR), California Governor's Office of Emergency Services (OES), California Highway Patrol (CHP), California Native American Heritage Commission (NAHC), California Natural Resources Agency, California Regional Water Quality Control Board, San Diego Region 9 (RWQCB), California State Lands Commission (SLC), Office of Historic Preservation, State Water Resources Control Board, Division of Drinking Water, State Water Resources Control Board, Division of Drinking Water, District 14, State Water Resources Control Board, Division of Drinking Water, District 26, State Water Resources Control Board, Division of Water Quality
Development Types
Residential (Units 2300, Acres 15360), Commercial (Sq. Ft. 634190, Acres 14.5, Employees 1312), Other (109 acres of various open space types)
Local Actions
Specific Plan
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Energy, Flood Plain/Flooding, Geology/Soils, Greenhouse Gas Emissions, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mandatory Findings of Significance, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Tribal Cultural Resources, Utilities/Service Systems, Vegetation, Wetland/Riparian, Wildfire
Public Review Period Start
Public Review Period End
Attachments
Draft Environmental Document [Draft IS, NOI_NOA_Public notices, OPR Summary Form, Appx,]
Notice of Completion [NOC] Transmittal form
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.
