Serenade II – Tentative Tract Map No. 6531 Project
Summary
SCH Number
2025090619
Lead Agency
City of Sanger
Document Title
Serenade II – Tentative Tract Map No. 6531 Project
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
Orchard/:R-1-6(Single Family Residential)/Residential Medium Density
Document Description
The Project proposes a 48-lot single-family residential subdivision (TTM 6531) at
approximately 5,000 square feet per lot, located within the city limits of the City of Sanger. On- and off-site improvements including internal circulation roads, interior local streets, curb, gutter, sidewalk, and landscaping are proposed as a part of the Project. Water and sewer utilities will be provided by the City. All residential units will be equipped with 450- watt solar panels manufactured by Canadian Solar, utilize all electric appliances and will be EV-ready (pre-wired during construction to allow for the future installation of EV residential charger).
The site is currently designated as Residential Medium Density pursuant to the Sanger General Plan Land Use Map. The site is zoned R-1-6 (Single-Family Residential, 6,000 square foot minimum lot size) under the Sanger Zoning Ordinance. The existing General Plan land use has a density requirement of 7.3–17.4 units per acre.
Due to the overall size of the Project site and adjacent developments to the east and west, the parcel cannot be developed to meet the General Plan land use density, zoning regulations, and right-of-way dedication requirements. Therefore, a General Plan Amendment to Low Medium Density Residential and a rezone to the R-1-7.5 Zone District is necessary to accommodate development of the site. The density requirements for the R-1-7.5 and Medium Low-Density Zone District is 4.5 to 5.8 units per gross acre. Due to the layout of the Project and the minimum standards of the underlying zone district (minimum parcel size of 7,500 square feet), a Planned Unit Development (PUD) will be required in order to approve and develop the Project. Deviations from the zone district standards will include setback, lot width, lot depth, and lot size.
The following discretionary entitlements are required for the proposed Project:
• General Plan Amendment to the Sanger General Plan to change the land use
designation of the Project site from Medium Density Residential to Low-Medium
Density Residential.
• Zone Change from the R-1-6 zone district to the R-1-7.5 zone district.
• Conditional Use Permit for a Planned Unit Development to deviate from the R-1-7.5
development standards for yard setback, lot width, lot depth, and lot size.
• Tentative Tract Map Approval.
Construction of the residential development would occur over a maximum of 12 to 18
months. It is anticipated that the following pieces of equipment would be used during
construction activities:
• Roller
• Loaded trucks
• Excavator
• Generator
• Service truck
• Air compressor
Contact Information
Name
Jaymie Brauer
Agency Name
City of Sanger
Job Title
Principal Planner
Contact Types
Lead/Public Agency
Address
Phone
Email
Location
Coordinates
Cities
Sanger
Counties
Fresno
Regions
Citywide
Cross Streets
North Avenue to the north, Bethel Avenue to the west, and Greenwood Avenue to the east
Zip
93657
Total Acres
10
Parcel #
332-090-03
State Highways
NA
Railways
San Joaquin Valley Railroad
Airports
NA
Schools
Madison Elementary, Sanger High, Lincoln Elementary
Waterways
NA
Township
14S
Range
22E
Section
24
Base
MDB&M
Notice of Completion
Development Types
Residential (Units 48, Acres 10)
Local Actions
General Plan Amendment, Planned Unit Development, Rezone, Use Permit, Land Division (Subdivision, etc.)
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Drainage/Absorption, Energy, Flood Plain/Flooding, Geology/Soils, Greenhouse Gas Emissions, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mandatory Findings of Significance, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Tribal Cultural Resources, Utilities/Service Systems, Vegetation, Wetland/Riparian, Wildfire
Public Review Period Start
Public Review Period End
Attachments
Draft Environmental Document [Draft IS, NOI_NOA_Public notices, OPR Summary Form, Appx,]
Notice of Completion [NOC] Transmittal form
State Comment Letters [Comments from State Reviewing Agency(ies)]
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.