1207 North Capitol Avenue Residential Project

2 Documents in Project

Summary

SCH Number
2025090597
Lead Agency
City of San Jose
Document Title
1207 North Capitol Avenue Residential Project
Document Type
NOD - Notice of Determination
Received
Posted
12/17/2025
Document Description
As proposed, the project would include demolition of the existing 3,680 square foot single-family residence to construct a five-story, 128-unit affordable housing development. All units would be located within a single U-shaped building with a courtyard and maximum building height of 53 feet and two inches. All units would be low-income units, with the exception of one manager’s unit at market rate. The building would include two lobbies, a fitness room, yoga studio, game room, community kitchen, offices, bike storage, and package room on the ground floor. The courtyard would consist of outdoor common open space and surface parking. Solar panels would be installed on the roof of the building. Access to the project site would be provided via a new 24-foot wide, two-way, right-in, right-out driveway along North Capitol Avenue. The driveway would lead to a surface parking lot located in the courtyard of the proposed building. The parking lot would contain 52 parking spaces.

Contact Information

Name
McKenzie Dibble
Agency Name
The Danco Group of Companies
Job Title
PM
Contact Types
Project Applicant

Name
Charlotte Yuen
Agency Name
City of San Jose
Job Title
Planner
Contact Types
Lead/Public Agency

Location

Cities
San Jose
Counties
Santa Clara
Regions
Citywide
Cross Streets
North Capitol Avenue/Ohlone Drive
Zip
95132
Total Acres
1.5
Parcel #
245-05-015
Railways
VTA LRT
Schools
Cherrywood ES, Berryessa Music, Sunshine School, Summerdale ES
Waterways
Penitencia Creek, Coyote Creek

Notice of Determination

Approving Agency
City of San Jose
Approving Agency Role
Lead Agency
Approved On
County Clerk
Santa Clara
Final Environmental Document Available at
200 East Santa Clara Street, 3rd Floor Tower, San Jose, CA 95113-1905.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV New Search Print