Lake Forest Verizon Tower

2 Documents in Project

Summary

SCH Number
2025090228
Lead Agency
Lake County
Document Title
Lake Forest Verizon Tower
Document Type
NOD - Notice of Determination
Received
Posted
11/25/2025
Document Description
Major Use Permit (PL-25-60/ UP 24-03) to construct a new 150’ tall lattice cell tower, including three (3) sectors of three (3) antennas each, totaling nine (9) panel antennas along with nine [9] remote radio units (RRU) mounted below/adjacent to the antennas. The proposed facility will be designed as a one hundred fifty-foot (150’) lattice tower with antennas at a tip height of one-hundred and twenty-four feet (124’). Associated equipment cabinets will be placed at the base of the tower within a new eight-foot (8’) chain-link fence enclosure occupying 900 square feet (referred to as the lease area). All equipment will be screened from public view.

Contact Information

Name
Trish Turner
Agency Name
Lake County Community Development Department, Planning Division
Job Title
Associate Planner
Contact Types
Lead/Public Agency

Name
Justin Gronendyke
Agency Name
Sequioa Deployment Services, Inc
Job Title
Permitting Specialists
Contact Types
Project Applicant

Location

Cities
Unincorporated Clearlake Oaks
Counties
Lake
Regions
Countywide
Cross Streets
Almond Lane
Zip
95423
Total Acres
35.95
Jobs
1
Parcel #
010-020-29
State Highways
CA State Hwy 20 and 53
Railways
None
Airports
None
Schools
None
Waterways
Sweet Hallow Creek

Notice of Determination

Approving Agency
Lake County Planning Commission
Approving Agency Role
Lead Agency
Approved On
County Clerk
Lake
Final Environmental Document Available at
255 N. Forbes Street, 3rd Floor, Lakeport, CA 95453

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Final Document(s) [Approved_Certified draft environmental documents]
Notice of Determination

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV Download All Attachments New Search Print