Hellman Solar PV Electrical System Project

2 Documents in Project

Summary

SCH Number
2025080495
Lead Agency
City of Seal Beach
Document Title
Hellman Solar PV Electrical System Project
Document Type
NOD - Notice of Determination
Received
Posted
10/6/2025
Document Description
The proposed Project would consist of the installation and operation of a 1.5 megawatt (MW) fixed-tilt ground mounted solar photovoltaic (PV) system at the Hellman Ranch Oil and Gas Production Facility. This system would interconnect with the Hellman Property's electrical infrastructure and operate in parallel with the utility grid to provide sustainable clean energy in support of the facilities operations. The proposed Project would include three separate solar arrays, consisting of a total of 56 solar tables, which would be comprised of 3,100 solar panels. The proposed PV system would cover approximately 2.66 acres on the north edge of the existing Hellman Ranch Oil and Gas Production Facility.

Contact Information

Name
Shaun Temple
Agency Name
City of Seal Beach
Job Title
Interim Community Development Director
Contact Types
Lead/Public Agency

Name
Devon Shay
Agency Name
Hellman Properties, LLC
Job Title
General Manager
Contact Types
Project Applicant

Location

Cities
Seal Beach
Counties
Orange
Regions
Citywide
Cross Streets
Pacific Coast Highway and 1st Street
Zip
90740
Total Acres
2.66
Parcel #
95-010-68
State Highways
SR-1, SR-22, I-405, I-605
Railways
None
Airports
None
Schools
McGaugh Elementary School
Waterways
San Gabriel River, Los Cerritos Wetlands, Pacific Ocean, Seal Beach National Wildlife Refuge

Notice of Determination

Approving Agency
City Of Seal Beach
Approving Agency Role
Lead Agency
Approved On
County Clerk
Orange
Final Environmental Document Available at
211 Eighth Street, Seal Beach, CA

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV New Search Print