Wyndham Lighting
Summary
SCH Number
2025080482
Public Agency
California Department of Transportation, District 2
(DOT)
Document Title
Wyndham Lighting
Document Type
NOE - Notice of Exemption
Received
Posted
8/12/2025
Document Description
The California Department of Transportation (Caltrans), using State and federal funding, is proposing to install four luminaires, including other minor improvements on State Route (SR) 273 in Shasta County. The limits of work occur between post mile (PM) 14.77 and 15.0.
The purpose of the project is to provide continuous lighting along the project limits, which would enhance the multimodal transportation network and improve public safety. The project is needed to reduce the potential for pedestrian and bike injuries along the subject section during nighttime hours.
Project implementation includes luminaire installation and median barrier replacement. To facilitate luminaire installation, a ±2-foot-diameter by ±2-foot-deep hole would be excavated to accommodate the footing. In support of the lighting, conduit would be integrated internally into the proposed median barrier. To provide power, conduit would be installed through horizontal boring (±175 feet, ±4 feet deep) between the median and an existing pedestal located northeast of the intersection of SR 273 and Wyndham Way. Minor potholing would occur along the proposed boring alignment. To maintain public safety, approximately 658 linear feet of median barrier would be replaced. As part of median barrier replacement, supplemental paving would be performed.
Approximately 0.095 acres of soil would be disturbed during project implementation;
estimated maximum excavation depth would be four feet. No vegetation removal is
proposed. Where applicable, project construction would be staged on the road shoulder. Lane closures may be necessary during construction.
Right-of-Way
The proposed work is expected to occur within the Caltrans’ right-of-way; no temporary construction easements are anticipated. Further, no permanent right-of-way take is anticipated.
Staging
Staging activities are expected to occur within Caltrans’ right-of-way.
Disposal/Borrow Sites
Excess soil would become the property of the contractor. No borrow sites are anticipated.
Utilities
Three city of Redding light poles occur within the median. These poles would be removed in advance of or concurrent with proposed construction activities. No other conflicts have been identified.
Schedule
The work would be completed in one construction season and would require approximately 30 days to complete.
Consultation/Coordination
Caltrans performed a records review, field surveys, and consultation/coordination with
applicable agencies, tribes, and individuals.
Permits
Based on the current scope, the project would not be subject to resource agency permits.
Contact Information
Name
Carolyn Sullivan
Agency Name
Caltrans
Job Title
Senior Environmental Planner
Contact Types
Lead/Public Agency
Phone
Location
Cities
Redding
Counties
Shasta
Regions
Northern California
Cross Streets
SR 273, Post miles 14.77 to 15.0
Notice of Exemption
Exempt Status
Categorical Exemption
Type, Section or Code
15303
Reasons for Exemption
Caltrans determined that the project is categorically exempt in accordance with Section 15303 (New Construction or Conversion of Small Structures) Class 3—Construction and location of limited numbers of new, small facilities or structures; installation of small new equipment and facilities in small structures; and the conversion of existing small structures from one use to another where only minor modifications are made in the exterior of the structure. The project would not have a significant effect on the environment.
Attachments
Notice of Exemption
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.