2023 Storm Damage, Dept. of Water Resources Levee Repair Site 23-078

2 Documents in Project

Summary

SCH Number
2025080059
Lead Agency
California Department of Water Resources (DWR)
Document Title
2023 Storm Damage, Dept. of Water Resources Levee Repair Site 23-078
Document Type
NOD - Notice of Determination
Received
Posted
9/25/2025
Document Description
This would be scheduled to occur within a permitted time period to avoid wet weather conditions and impacts on special-status species. The following information details proposed repair and rehabilitation activities, environmental commitments, construction considerations, and the proposed schedule for repairs. Environmental commitments include conservation measures and/or best management practices that were developed in coordination with resource agencies to avoid, minimize, and/or provide compensation for effects on biological resources and water quality. Typical construction activities are subdivided into the following stages: 1) Mobilization - site access and staging areas, 2) Site preparation, 3) Construction and 4) Demobilization - restorations and cleanup.

Contact Information

Name
Kristin S Ford
Agency Name
Department of Water Resources
Job Title
Environmental Scientist
Contact Types
Lead/Public Agency

Location

Cities
Harrington
Counties
Colusa
Regions
Northern California, Unincorporated
Cross Streets
White Road and Colusa Basin Drainage Canal
Zip
95912
Total Acres
0.86
Parcel #
022-160-059-000, 022-160-013-000
Waterways
Colusa Basin Drainage Canal, Unnamed Agricultural Canal
Township
13, 14
Range
01W
Section
13N

Notice of Determination

Approving Agency
Department of Water Resources
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.