Murray Avenue Water Pipeline Replacement

Summary

SCH Number
2025071236
Public Agency
City of Gilroy
Document Title
Murray Avenue Water Pipeline Replacement
Document Type
NOE - Notice of Exemption
Received
Posted
7/30/2025
Document Description
On Murray Avenue, the existing four-inch water pipeline would be abandoned in place, and approximately 70 feet of eight-inch ductile iron pipeline would be installed in the public right-of-way at the intersection of Murray Avenue and Burke Drive to reconnect the Burke Drive distribution main to the existing 12-inch pipeline on Murray Avenue. Twelve service lines along Murray Avenue between Burke Drive and Leavesley Road would be disconnected from the existing four-inch water pipeline and reconnected to the existing 12-inch water pipeline using open-cut methods.

Contact Information

Name
Heath McMahon
Agency Name
City of Gilroy
Job Title
Utilities Director
Contact Types
Lead/Public Agency

Location

Cities
Gilroy
Counties
Santa Clara
Regions
Citywide
Cross Streets
Murray Avenue between Burke Drive and Leavesley Road
Zip
95020
State Highways
US 101
Railways
Union Pacific
Airports
San Martin Airport
Schools
Brownell Middle School
Waterways
Miller Slough

Notice of Exemption

Exempt Status
Statutory Exemption
Type, Section or Code
21080.21; 15282(k)
Reasons for Exemption
Project would replace existing water pipelines with new pipelines measuring less than one mile in length and meeting current code.
County Clerk
Santa Clara

Attachments

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV Download All Attachments New Search Print