Broadway Street and Sargent Street Water Pipeline Replacement
Summary
SCH Number
2025071233
Public Agency
City of Gilroy
Document Title
Broadway Street and Sargent Street Water Pipeline Replacement
Document Type
NOE - Notice of Exemption
Received
Posted
7/30/2025
Document Description
On Broadway Street, approximately 370 feet of existing six-inch water pipeline would be removed, and the rest abandoned. Approximately 1,300 feet of new eight-inch ductile iron pipeline would be installed in the public right-of-way between Wayland Lane and Hanna Street using open trench methods.
On Sargent Street, the existing four-inch water pipeline would be abandoned in place, and approximately 210 feet of new eight-inch ductile iron pipeline would be installed in the public right-of-way between Broadway Street and First Street using open trench methods.
Contact Information
Name
Heath McMahon
Agency Name
City of Gilroy
Job Title
Utilities Director
Contact Types
Lead/Public Agency
Phone
Location
Cities
Gilroy
Counties
Santa Clara
Regions
Citywide
Cross Streets
Broadway Street from Wayland Lane to Hannah Street and Sargent Street from Broadway to First Str
Zip
95020
State Highways
US 101
Railways
Union Pacific
Airports
San Martin Airport
Schools
Brownell Middle School
Waterways
Miller Slough
Notice of Exemption
Exempt Status
Statutory Exemption
Type, Section or Code
21080.21; 15282(k)
Reasons for Exemption
Project would replace existing water pipelines with new pipelines measuring less than one mile in length and meeting current codes.
County Clerk
Santa Clara
Attachments
Notice of Exemption
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.