Big Chico Creek Erosion Repair Project (Capital Project # 50497)

2 Documents in Project

Summary

SCH Number
2025070810
Lead Agency
City of Chico
Document Title
Big Chico Creek Erosion Repair Project (Capital Project # 50497)
Document Type
NOD - Notice of Determination
Received
Posted
8/25/2025
Document Description
The City proposes to conduct erosion repair and bank stabilization at two bridge crossings over Big Chico Creek, Rose Avenue and Warner Street, and a third erosion repair site near the intersection of Manzanita and Vallombrosa in the City of Chico. Heavy flows from 2023 winter storms caused scouring along the banks from the abutments at Rose Avenue and Warner Street Bridges. At the Manzanita and Vallombrosa erosion repair site, the west bank of the creek has significant erosion at the base, creating a “cave” that is exposed during normal flows. Rock slope protection (RSP) will be placed along the areas of scour at all three locations to prevent further damage and reinforce the banks and structures to better withstand future storm events.

Contact Information

Name
Tracy R. Bettencourt
Agency Name
City of Chico
Job Title
Senior Planner
Contact Types
Lead/Public Agency / Project Applicant

Location

Cities
Chico
Counties
Butte
Regions
Citywide
Cross Streets
Rose Avenue, Warner Street, Manzanita Avenue, Vallombrosa Avenue
Zip
95927
Total Acres
1.85
Parcel #
043-681-085, 043-690-032, 003-200-001, -002, 016-170-001
Waterways
Big Chico Creek
Other Location Info
Rose Avenue over Big Chico Creek, Warner Street over Big Chico Creek, and the Big Chico Creek site just southwest of the intersection of Manzanita Avenue and Vallombrosa Avenue

Notice of Determination

Approving Agency
City of Chico
Approving Agency Role
Lead Agency
Approved On
County Clerk
Butte
Final Environmental Document Available at
https://chico.ca.us/Departments/Engineering/Capital-Projects/Big-Chico-Creek-Erosion-Repair-Project/

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Final Document(s) [Approved_Certified draft environmental documents]

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV Download All Attachments New Search Print