State Street Widening Project

Summary

SCH Number
2025070438
Lead Agency
San Bernardino County
Document Title
State Street Widening Project
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
MS/SD-COM; Zoning District Muscoy /Special Development-Commercial; General Plan Land Use Categories 2023: C: Commercial
Document Description
The County has designed the proposed Project to conform with the General Plan Transportation & Mobility Element Policy Maps. The roadway ultimate classification is that of a Major Highway – SBC Std. Plan 101, four lane highway with intersections at grade and control access. In order to minimize right-of- way take and encroachment into typical residential structure setback requirements, as well as to address current and projected emerging mobility needs, proposed work involves widening of the roadway west of its existing centerline to accommodate improvements for approximately 0.61 miles on State Street from Adams Street to Darby Street. The interim geometric section and improvements posed west of the centerline affords the inclusion of a 12-foot median that obliges left turn movement at intersections and midblock access to individual parcels, a 12-foot through travel lane - southbound, an eight-foot shoulder to accommodate on-street parking and refuse pickup, and a five-foot parkway to accommodate sidewalk and driveway approaches. Provisions for the inclusion of ADA compliant curb ramps, curb and gutter and street lighting are also addressed. Existing improvements easterly of the centerline for the interim condition will remain largely as is. Anticipated maximum excavation depth for most work is 18-inches. Streetlights are to be installed within the Project limits that lie within CSA 70 SL-5. Placement/work should be coordinated with Special Districts/Streetlights and complement existing lighting present with mid-block locations alternating, where feasible, from one side of the street to the other. Standard spacing for residential streetlighting is 200-feet on-center. Street lighting placed on the easterly side of State Street should match that currently present utilizing existing power poles. The maximum excavation depth for this work will be 48”. The Project is currently scheduled for construction in 2027.

Contact Information

Name
Patrick Egle
Agency Name
San Bernardino County Department of Public Works
Job Title
Senior Planner
Contact Types
Lead/Public Agency / Project Applicant

Location

Cities
Community of Muscoy
Counties
San Bernardino
Regions
Southern California, Unincorporated
Cross Streets
State Street from Adams Street to Darby Street
Zip
92407
Parcel #
N/A
State Highways
210 and 215
Railways
BNSF
Airports
N/A
Schools
Manuel A. Salinas Creative Arts Elementary School
Waterways
Lytle Creek / Governor Edmund G Brown East Br CA Aqueduct
Township
1N
Range
4W
Base
SBB&M
Other Location Info
The Project location is State Street from Adams Street to Darby Street in the Muscoy Area.

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Conservation (DOC), California Department of Fish and Wildlife, Inland Deserts Region 6 (CDFW), California Department of Forestry and Fire Protection (CAL FIRE), California Department of Parks and Recreation, California Department of Toxic Substances Control (DTSC), California Department of Transportation, District 8 (DOT), California Department of Transportation, Division of Aeronautics (DOT), California Department of Transportation, Division of Transportation Planning (DOT), California Department of Water Resources (DWR), California Fish and Game Commission (CDFGC), California Governor's Office of Emergency Services (OES), California Highway Patrol (CHP), California Native American Heritage Commission (NAHC), California Natural Resources Agency, California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, Santa Ana Region 8 (RWQCB), California State Coastal Conservancy (SCC), Colorado River Board, Office of Historic Preservation, State Water Resources Control Board, Division of Drinking Water
Development Types
Transportation:Highway/Freeway (Widening of Major Highway)
Local Actions
Construction Project
Project Issues
Air Quality, Biological Resources, Cultural Resources, Tribal Cultural Resources
Public Review Period Start
Public Review Period End

Attachments

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV Download All Attachments New Search Print