Adelanto-Rinaldi Line 1 Upgrade Project
Summary
SCH Number
2025070053
Lead Agency
Los Angeles Department of Water and Power
Document Title
Adelanto-Rinaldi Line 1 Upgrade Project
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
Light Agriculture, Heavy Agriculture, and Open Space / RL20 (Rural Land), N1 (Non-Urban), and OS-C (Open Space/Conservation)
Document Description
The Los Angeles Department of Water and Power (LADWP) is proposing the Adelanto-Rinaldi Line 1 Upgrade Project (proposed project), which involves ampacity upgrades of the Adelanto – Rinaldi Line 1 (ADL-RIN L1) transmission line to increase its capacity from its current rating of 500 kV at 1593A/1593A (continuous/emergency) to approximately 500 kV at 1680A/1965A. The ampacity upgrade requires ground clearance grading and tower raises in order to be compliant with transmission line safety and reliability standards. The location of the proposed project is along one existing 500 kilovolt (kV) overhead transmission line (ADL-RIN L1) located in the northern portion of Los Angeles County.
The proposed project would be required to comply with the California Public Utilities Commission’s (CPUC) General Order 95 (GO 95) Clearance Code Requirements as mandated by the North American Electric Reliability Corporation (NERC). The specific clearance requirements set by General Order 95 (GO 95) are included in Appendix A. Achieving this height consistency is necessary to ensure the distance between the transmission line conductors and the ground or road surface below is sufficient to meet code requirements guiding the safe and reliable operation of transmission lines. LADWP proposes to comply with the code clearances by grading the ground surface of the area underneath the transmission lines at nine work areas to achieve height consistency per NERC requirements. Additionally, LADWP has identified eight locations where towers would be raised by approximately 10 to 20 feet in order to achieve height consistency.
The total acreage of grading would be approximately 3.74 acres, and the total acreage of tower raising activities would be an additional 1.44 acres. The project, as proposed, would also involve improvements to portions of existing access roads to be used for site access, equipment staging and storage, and distribution of excavated soils. Construction would occur sequentially along the transmission line corridor and is anticipated to take up to 2.5 years. Once construction is complete, operation activities would be minimal and limited to routine operations and maintenance inspections as are currently carried out on the existing line.
Contact Information
Name
Jazmin Martin
Agency Name
Los Angeles Department of Water and Power
Job Title
Environmental Specialist
Contact Types
Lead/Public Agency / Project Applicant
Phone
Email
Location
Cities
Palmdale, San Fernando, Santa Clarita
Counties
Los Angeles
Regions
Countywide
Cross Streets
Multiple
Zip
Multiple
Total Acres
5.18
Parcel #
Multiple
State Highways
138, 14, 405
Railways
Metrolink Antelope Valley Line
Airports
Agua Dulce Airport
Schools
Saugus Union USD, LAUSD, Golden Valley HS, Valley View ES, Anave
Waterways
Los Angeles Reservoir
Township
Many
Range
Many
Section
Many
Notice of Completion
State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Fish and Wildlife, South Coast Region 5 (CDFW), California Department of Parks and Recreation, California Department of Toxic Substances Control (DTSC), California Department of Transportation, District 7 (DOT), California Department of Transportation, Division of Aeronautics (DOT), California Department of Transportation, Division of Transportation Planning (DOT), California Department of Water Resources (DWR), California Energy Commission, California Governor's Office of Emergency Services (OES), California Highway Patrol (CHP), California Native American Heritage Commission (NAHC), California Natural Resources Agency, California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, Lahontan Victorville Region 6 (RWQCB), California Regional Water Quality Control Board, Los Angeles Region 4 (RWQCB), California State Lands Commission (SLC), Office of Historic Preservation, San Gabriel and Lower Los Angeles Rivers and Mountains Conservancy (RMC), State Water Resources Control Board, Division of Water Quality, State Water Resources Control Board, Division of Water Rights
Development Types
Power:Electric Transmission Lines (Electric Transmission Line Upgrade (Existing))(Megawatts 1965)
Local Actions
LADWP Board Approval
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Energy, Flood Plain/Flooding, Geology/Soils, Greenhouse Gas Emissions, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Tribal Cultural Resources, Utilities/Service Systems, Wetland/Riparian, Wildfire
Public Review Period Start
Public Review Period End
Attachments
Draft Environmental Document [Draft IS, NOI_NOA_Public notices, OPR Summary Form, Appx,]
Notice of Completion [NOC] Transmittal form
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.