Line 2000E Phase 3 Validation Dig AG2023S1P3E2 Project
Summary
SCH Number
2025061352
Public Agency
California Regional Water Quality Control Board, Colorado River Basin Region 7
(RWQCB)
Document Title
Line 2000E Phase 3 Validation Dig AG2023S1P3E2 Project
Document Type
NOE - Notice of Exemption
Received
Posted
6/30/2025
Document Description
The purpose of this project is to inspect and repair an existing natural gas pipeline within SoCalGas' right of way.
Excavation will be done along the pipeline to expose it for inspection, to conduct tests, and make any necessary
repairs. The excavated soil would used to back fill the area to return to preexisting condition to the extent possible.
Contact Information
Name
Logan Raub
Agency Name
California Water Quality Control Board Region 7
Job Title
Senior Environmental Scientist
Contact Types
Lead/Public Agency
Phone
Name
Max Salazar
Agency Name
Southern California Gas Company
Job Title
Pipeline Integrity Project Manager
Contact Types
Project Applicant / Parties Undertaking Project
Phone
Email
Location
Coordinates
Cities
Coachella
Counties
Riverside
Regions
Citywide, Countywide, Southern California, Unincorporated
Zip
92236
Total Acres
0.39
State Highways
I-10
Township
10E
Range
6S
Section
5
Notice of Exemption
Exempt Status
Categorical Exemption
Type, Section or Code
Class 1, California Code of Regulations, Title 14, Section 15301
Reasons for Exemption
As a maintenance project on an existing pipeline with no expansion or change in
capacity, this project falls meets the requirements for the "Existing Facilities"
exemption with no exceptions to the exemption.
Attachments
Notice of Exemption
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.