McCann Operations Center Improvements Project

Summary

SCH Number
2025060998
Lead Agency
Purissima Hills Water District
Document Title
McCann Operations Center Improvements Project
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
Utilities, Zoning: Residential Agriculture (R-A), General Plan: Residential
Document Description
The Purissima Hills Water District (District) is implementing improvements to the McCann Operations Center, which houses the District’s maintenance staff, parts inventory, and vehicles. Improvements include replacing the existing building with a new 2-story structure in approximately the same location as the existing operations center. The footprint of the new building extends into the hillside, which will require grading of the slope and the installation of a retaining wall. Improvements also include a new emergency generator (30kW), new 2,000-gallon above ground fuel tank that will have two separate internal fuel tanks, and covered storage area along the southern developed area of the site. Additionally, the project includes encroachment into an existing conservation easement. The purpose of the project is to erect a facility that could withstand and remain operational after a seismic event, as the existing building was built in 1970, and a recent seismic evaluation determined that the building would not meet full compliance for ASCE 31 Tier 1 Life Safety Performance Criteria.

Contact Information

Name
Tammy Rudock
Agency Name
Purissima Hills Water District
Job Title
Interim General Manager
Contact Types
Lead/Public Agency / Project Applicant

Name
Christina Lau
Agency Name
MIG
Job Title
Project Manager
Contact Types
Consulting Firm

Location

Cities
Los Altos Hills
Counties
Santa Clara
Regions
San Francisco Bay Area
Cross Streets
St. Francis Road, Anacapa Drive
Zip
94022
Total Acres
1.48
Parcel #
175-53-030
State Highways
HYW 280
Schools
Pinewood School, Gardner Bullis Elementary School

Notice of Completion

Development Types
Office (Sq. Ft. 7600, Acres 1.48, Employees 5)
Local Actions
Site Plan
Project Issues
Aesthetic/Visual, Air Quality, Archeological/Historical, Biological Resources, Drainage/Absorption, Geologic/Seismic, Noise, Soil Erosion/Compacting/Grading, Solid Waste, Toxic/Hazardous, Vegetation, Water Quality, Water Supply/Groundwater
Public Review Period Start
Public Review Period End

Attachments

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV Download All Attachments New Search Print