Advanced Metering Infrastructure (AMI) Implementation Phase I
Summary
SCH Number
2025060494
Public Agency
Rubidoux Community Service District
Document Title
Advanced Metering Infrastructure (AMI) Implementation Phase I
Document Type
NOE - Notice of Exemption
Received
Posted
6/11/2025
Document Description
The Advanced Metering Infrastructure (AMI) Implementation Phase I (the Project) consists of removal and replacement of 4,982 existing manually-read water service meters with AMI meters ranging in sizes from 3/4-inch diameter through 6-inch diameter and construction and operation of AMI system facilities (antenna towers and electrical power and control components) at up to thirteen (13) existing developed sites, including the District's offices and treatment, pumping, and storage reservoir sites. The purpose of the Project is to improve water use efficiency and water management within the District. The Project will benefit the customers of the Rubidoux Community Services District.
Contact Information
Name
Jaclyn Makarzec
Agency Name
Rubidoux Community Services District
Job Title
District Engineer
Contact Types
Lead/Public Agency
Phone
Email
Location
Counties
Riverside
Regions
Citywide
Zip
92509
Other Location Info
The Project is located at 4,982 existing water service connections throughout the District's service area, as well as at up to thirteen (13) existing developed sites, including the District's offices and treatment, pumping, and storage reservoir sites. All Project facilities are located within the District's existing water service area.
Notice of Exemption
Exempt Status
Categorical Exemption
Type, Section or Code
Class 1: Existing Facilities (CEQA Guidelines §15301)
Reasons for Exemption
The Project involves replacement of existing water service meters and construction of associated system facilities (antenna towers and electrical power and control components) within existing, developed, District-owned sites. The Project involves negligible, if any, expansion of existing use, and there is no possibility of significant environmental effect.
Exempt Status
Other
Type, Section or Code
State CEQA Guidelines Section 15061(b)(3)
Reasons for Exemption
The Project involves replacement of existing water service meters and construction of associated system facilities (antenna towers and electrical power and control components) within existing, developed, District-owned sites. The Project involves negligible, if any, expansion of existing use, and there is no possibility of significant environmental effect.
County Clerk
Riverside
Attachments
Notice of Exemption
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.