Ventura West Marina Redevelopment Project

2 Documents in Project

Summary

SCH Number
2025060100
Lead Agency
Ventura Port District
Document Title
Ventura West Marina Redevelopment Project
Document Type
NOD - Notice of Determination
Received
Posted
7/24/2025
Document Description
The Ventura West Marina Redevelopment Project (Project) includes the replacement of the existing aged docks and pilings with new docks and pilings. The Project also includes the addition of an ADA accessible gangway, electrical charging infrastructure and individual wastewater pump out systems. Waterside improvements would be located within the existing waterside portion of Parcel 17. The new slip layout will largely retain the current dock footprint. As part of the proposed Project, the Applicant will remove the existing 45-year-old dock system including all floating elements, submerged piles, and related infrastructure. and install new, environmentally sustainable dock systems with a marina slip layout that allows a more diverse range of vessel sizes. The existing marina channels will be enhanced to improve navigational flow and to accommodate larger vessels. Overall, average slip size will increase by approximately one foot. The total number of slips will decrease by eight from 387 to 379 and thereby allow for more public areas within the marina including launching of non-motorized vessels such as kayaks and stand-up paddleboards and a location where a future water taxi could embark passengers. Additional Project features include: • Add an ADA-accessible gangway to the dock system. • Add electrical charging infrastructure to support electric powered watercraft. • Provide individual wastewater pump out systems for medium to large vessels at their slips and a public-facing wastewater pump out for other vessels in and out of the marina. The current marina configuration has approximately 302 piles. It is estimated that all existing piles would be removed, and new piles would be installed. All new piles will be at or above the District’s minimum pile elevation which was set in 2014 to address sea level rise and tsunami concerns. These enhancements would improve navigational flow and accommodate larger vessels.

Contact Information

Name
Jessica Rauch
Agency Name
Ventura Port District
Job Title
Executive Assistant / Clerk of the Board
Contact Types
Lead/Public Agency

Name
TBBW Company
Agency Name
Ventura West Marina
Job Title
Project Applicant
Contact Types
Project Applicant

Location

Cities
Ventura
Counties
Ventura
Regions
Citywide
Cross Streets
Anchors Way Drive/Navigator Drive
Zip
93001
Total Acres
12.5
Parcel #
0800240325
State Highways
101
Schools
Pierpont Elementary
Waterways
Pacific Ocean

Notice of Determination

Approving Agency
Ventura Port District
Approving Agency Role
Lead Agency
Approved On
County Clerk
Ventura
Final Environmental Document Available at
1603 Anchors Way Drive, Ventura, CA 93001

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV New Search Print