Removal and Decommissioning of Kanaka Powerhouse for Kanaka Hydroelectric Project License Surrender (FERC p-7242)

2 Documents in Project

Summary

SCH Number
2025050141
Lead Agency
State Water Resources Control Board
Document Title
Removal and Decommissioning of Kanaka Powerhouse for Kanaka Hydroelectric Project License Surrender (FERC p-7242)
Document Type
NOD - Notice of Determination
Received
Posted
7/15/2025
Document Description
STS is proposing to: (1) remove the former Kanaka Powerhouse and substation structures and regrade the site to match surrounding contours; (2) install a concrete plug in the screened intake pipe, permanently inhibiting water diversions to the penstock; (3) cut and cap the lower end of the penstock and install a concrete plug to permanently disconnect the penstock from the powerhouse and abandon-in-place the penstock; (4) install a sand and gravel plug in the penstock wet well to stop water collection (5) fill and grade the tailrace with native material to abandon it in place; (6) abandon-in-place the Kanaka Diversion Dam; and (7) rehabilitate an existing unnamed access road by removing vegetation to provide access for the decommissioning of the Hydroelectric Project. Following Project implementation, the road will remain in place.

Contact Information

Name
Glenn W Talley Hoffmann
Agency Name
State Water Resources Control Board
Job Title
Engineering Geologist
Contact Types
Lead/Public Agency

Name
Melissa Rondou
Agency Name
STS Hydropower, LLC c/o Eagle Creek Renewable Energy LLC
Job Title
Director, Licensing and Compliance
Contact Types
Project Applicant

Location

Cities
Forbestown, Unincorporated area
Counties
Butte
Regions
Countywide, Northern California, Unincorporated
Cross Streets
Utility Rd 3
Zip
95966
Waterways
Sucker Run Creek

Notice of Determination

Approving Agency
State Water Resources Control Board
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Final Document(s) [Approved_Certified draft environmental documents]

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV Download All Attachments New Search Print