Lower Central Interceptor Rehabilitation Project
2 Documents in Project
Summary
SCH Number
2025041402
Lead Agency
Sacramento Area Sewer District
(SASD)
Document Title
Lower Central Interceptor Rehabilitation Project
Document Type
NOD - Notice of Determination
Received
Posted
7/10/2025
Document Description
The Proposed Project includes structural rehabilitation of the LCI pipeline. The LCI pipeline will be rehabilitated using CIPP lining, a trenchless rehabilitation process in which a resin-impregnated liner is inserted into the deteriorated pipeline and cured using hot water, creating a new "pipe within a pipe." Because of the large size of the LCI pipeline, the CIPP liner will be inserted via approximately 21 excavation pits, approximately 15 feet by 15 feet and as deep as the existing pipeline, along the LCI pipeline alignment, spaced at intervals of approximately 2,000 feet apart.
Contact Information
Name
Linda Peters
Agency Name
Sacramento Area Sewer District
Job Title
Senior Civil Engineer
Contact Types
Lead/Public Agency / Project Applicant
Phone
Email
Location
Coordinates
Cities
Sacramento
Counties
Sacramento
Regions
Citywide, Countywide
Cross Streets
Cosumnes River Blvd, Franklin Blvd
Zip
95023
Total Acres
8.3
Parcel #
Multiple
State Highways
99
Railways
UPRR
Airports
None
Schools
Multiple
Waterways
Laguna Creek, Morrison Creek
Township
7N
Range
5E
Section
17
Base
MDM
Notice of Determination
Approving Agency
Sacramento Area Sewer District
Approving Agency Role
Lead Agency
Approved On
County Clerk
Sacramento
Final Environmental Document Available at
https://ceqanet.lci.ca.gov/
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Draft Environmental Document [Draft IS, NOI_NOA_Public notices, OPR Summary Form, Appx,]
Final Document(s) [Approved_Certified draft environmental documents]
Notice of Determination
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.