Lake or Streambed Alteration Agreement No. EPIMS-TRI-58439-R1, Timber Harvesting Plan (THP) 2-24-00197-TRI “Blue Shanty.
Summary
SCH Number
2025031078
Lead Agency
California Department of Forestry and Fire Protection
(CAL FIRE)
Document Title
Lake or Streambed Alteration Agreement No. EPIMS-TRI-58439-R1, Timber Harvesting Plan (THP) 2-24-00197-TRI “Blue Shanty.
Document Type
NOD - Notice of Determination
Received
Posted
3/25/2025
Document Description
The project is limited to 5 encroachments at water drafting sites 1-5. These sites
may be excavated as necessary to increase water capacity. Excavated material must be placed in a stable location without direct access to any watercourse. Operations for these water drafting sites is identified and described in Section II of the Timber Harvesting Plan (THP) 2-24-00197-TRI “Blue Shanty,” pages 70-75, and located within Maps Pages 76-84.
Contact Information
Name
Andrew James Yarusso
Agency Name
Department of Fish and Wildlife
Job Title
Senior Environmental Scientist (Specialist)
Contact Types
Responsible Agency
Address
Phone
Name
Jon Woessner
Agency Name
Department of Forestry and Fire Protection
Job Title
Review Team Chair
Contact Types
Lead/Public Agency
Phone
Location
Cities
Redding
Counties
Shasta
Regions
Northern California
Township
30N
Range
09W
Section
2-4
Base
MDBM
Other Location Info
The project is located in the County of Trinity, State of California; Township 30 North, Range 09 West, Sections 2-4, and Township 31 North, Range 09 West, Sections 33-35 Mt. Diablo Base and Meridian; USGS 7.5-minute quadrangles, Chanchelulla Peak and Arbuckle Mountain
Notice of Determination
Approving Agency
Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Timber Harvesting Plan)
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.