Bridge Replacement at Las Posas Road and Ventura Boulevard (SD-5052)

2 Documents in Project

Summary

SCH Number
2025030790
Lead Agency
City of Camarillo
Document Title
Bridge Replacement at Las Posas Road and Ventura Boulevard (SD-5052)
Document Type
NOD - Notice of Determination
Received
Posted
6/4/2025
Document Description
The City of Camarillo proposes to replace the existing drain box culvert that crosses diagonally under the intersection of Las Posas Road and Ventura Boulevard (Bridge #52C-0086) and widen Las Posas Road south of the intersection to accommodate the addition of a sidewalk, bike lane, and safety shoulders (Project) in Ventura County. The Project limits extend approximately 700 feet north and west of Las Posas Road and Ventura Boulevard intersection and approximately 1,000 feet east and south of the intersection. The portion of the box culvert constructed in 1998 is deteriorating due to Alkali-Silica Reaction (ASR) within the concrete.

Contact Information

Name
Andrew Grubb
Agency Name
City of Camarillo
Job Title
Principal Civil Engineer
Contact Types
Lead/Public Agency

Location

Cities
Camarillo
Counties
Ventura
Regions
Southern California
Cross Streets
Las Posas Road and Ventura Boulevard
Zip
93010
State Highways
California
Railways
Union Pacific Railroad
Airports
Camarillo Airport
Schools
Las Posas Elementary School, ACE Charter HS, Frontier HS
Waterways
Camarillo Hills Drain

Notice of Determination

Approving Agency
City of Camarillo
Approving Agency Role
Lead Agency
Approved On
County Clerk
Ventura
Final Environmental Document Available at
Public Works, City of Camarillo, 601 Carmen Drive, Camarillo, CA 93010

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV New Search Print