Outer Harbor Wharf Modernization Project
2 Documents in Project
Summary
SCH Number
2025030228
Lead Agency
Port of Oakland
Document Title
Outer Harbor Wharf Modernization Project
Document Type
NOD - Notice of Determination
Received
Posted
6/16/2025
Document Description
The Port proposes to modernize aging wharf infrastructure at Berths 22-38 fronting the Port’s Outer Harbor Channel. The modernization will enable efficient berthing, mooring, and servicing of existing and future vessels calling at the Port and will allow for flexibility with berthing locations. Specific components will include improving bollards, fenders, crane rail girders and rails; modernizing a curved rail to enable connection between two linear wharf segments that are at angle; electrical upgrades at select berths; installing a floating dock at Berth 34 to enable docking of support vessels such as tugboats or emissions capture and control barges; and general repair needed due to deferred maintenance on wharf structures. The modernization of certain crane rail girders will involve the in-water placement of new or replacement support piles. No additional cargo throughput at the Port would be generated by the project. Phasing of the project’s construction would generally occur as funding becomes available for each component.
Contact Information
Name
Elizabeth Nagle
Agency Name
Port of Oakland
Job Title
Project Manager
Contact Types
Lead/Public Agency
Phone
Email
Location
Coordinates
Counties
Alameda
Regions
Citywide
Cross Streets
7th Street / Maritime Street (2340 7th Street)
Zip
94606
Total Acres
approx 80
Parcel #
18-320-1-2 and 18-350-1
State Highways
I-80, I-580, I-980, I-880
Railways
+-+
Notice of Determination
Approving Agency
Port of Oakland
Approving Agency Role
Lead Agency
Approved On
County Clerk
Alameda
Final Environmental Document Available at
https://www.portofoakland.com/business/bids-rfp-center/environmental-stewardship-publications-documents
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Final Document(s) [Approved_Certified draft environmental documents]
Notice of Determination
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.