Laguna Creek Inter-Regional Trail Crossing at State Route 99
4 Documents in Project
Summary
SCH Number
2025020580
Lead Agency
Sacramento County
Document Title
Laguna Creek Inter-Regional Trail Crossing at State Route 99
Document Type
NOD - Notice of Determination
Received
Posted
10/21/2026
Document Description
The project includes construction of a 0.43-mile segment of the Laguna Creek Inter-Regional Trail network. Specifically, the project consists of a pedestrian overcrossing spanning West Stockton Boulevard, SR 99, and East Stockton Boulevard; a multi-use trail east of the overcrossing; and a pedestrian bridge spanning Whitehouse Creek. The multi-use trail east of the overcrossing would have 10-foot-wide pavement with 2-foot-wide unpaved shoulders and it would be elevated above the existing ground surface by approximately 2 feet.
Contact Information
Name
Cherry Zamora
Agency Name
California Transportation Commission
Job Title
Associate Deputy Director
Contact Types
Responsible Agency
Phone
Name
Travis Kuhn
Agency Name
City of Elk Grove
Job Title
Senior Civil Engineer
Contact Types
Lead/Public Agency
Phone
Email
Location
Cities
Elk Grove
Counties
Sacramento
Regions
Northern California
Other Location Info
The project is located in a 29.7-acre area between the Sheldon Road/State Route (SR) 99 Interchange to the north and the Bond Road/SR 99 Interchange to the south
in the City of Elk Grove in Sacramento County. The proposed crossing is at State Route 99, Post Miles 14.3 to 14.4.
Notice of Determination
Approving Agency
California Transportation Commission
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Sacramento
Final Environmental Document Available at
8401 Laguna Palms Way, Elk Grove, CA 95758
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.
