Water Tank 1 (Cunningham Tank) Replacement Project IS/MND
2 Documents in Project
Summary
SCH Number
2025020008
Lead Agency
City of San Bruno
Document Title
Water Tank 1 (Cunningham Tank) Replacement Project IS/MND
Document Type
NOD - Notice of Determination
Received
Posted
5/30/2025
Document Description
The project proposes replacing an existing 2.5-million-gallon, seismically deficient water tank that no longer meets the latest codes and standards for water tank structures. The tank would be replaced with a new 3.5 MG prestressed concrete water tank (112 feet in diameter with a 60-foot, 6-inch tall wall height and domed roof). Approximately 42 feet-6 inches of the tank wall will be visible above the ground. To accommodate the additional capacity, the new tank will be buried approximately 18 feet below grade surface to minimize the overall height of the structure. The new tank will occupy the same footprint as the existing tank. The project also involves revising arrangement and depth of the waterlines, site drainage, and other components linked to the larger capacity and partially buried tank, widening of the existing access road and construction of a retaining wall, a new chemical building with retaining wall, and replacement of an existing drainage pipe.
Contact Information
Name
Talha Amar
Agency Name
CITY OF SAN BRUNO
Job Title
Associate Engineer
Contact Types
Lead/Public Agency
Phone
Email
Location
Coordinates
Cities
San Bruno
Counties
San Mateo
Regions
Citywide
Parcel #
019-300-140
Notice of Determination
Approving Agency
City of San Bruno
Approving Agency Role
Lead Agency
Approved On
County Clerk
San Mateo
Final Environmental Document Available at
576 El Camino Real, San Bruno, CA 94066
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.