Summit Drive Wireless

2 Documents in Project

Summary

SCH Number
2025010339
Lead Agency
Santa Cruz County
Document Title
Summit Drive Wireless
Document Type
NOD - Notice of Determination
Received
Posted
6/27/2025
Document Description
Proposal to modify an existing wireless communication facility to include removal, of the existing 70 foot 6-inch tall, guyed lattice tower and related equipment, satellite dish, shed, 12 foot 6-inch-tall lattice tower, and chain link fencing, and replacement with an approximately 151.1-foot tall wireless communication facility, with nine panel antennas and associated wireless equipment, a generator within an existing equipment building, outdoor propane tank, repainted equipment building, landscape screening, and other miscellaneous improvements located within the existing building and site enclosure, proposed to be contained within an area surrounded by a new six- foot chain link fence with green slats and barbed wire above. Requires a Commercial Development Permit and Exception to Height

Contact Information

Name
Sheila McDaniel
Agency Name
County of Santa Cruz
Job Title
Planner
Contact Types
Lead/Public Agency

Name
Tom Derkas
Agency Name
Delta Group Engineering
Job Title
Engineer
Contact Types
Project Applicant

Location

Cities
Bonny Doon, Santa Cruz
Counties
Santa Cruz
Regions
Countywide
Cross Streets
Summit Dr and Empire Grade
Zip
95060
Total Acres
2.216
Parcel #
080-062-02
State Highways
Hwy 9
Railways
0
Airports
0
Schools
0
Waterways
San Vicente Creek, Laguna Creek, Fall Creek, Stream 161
Township
10S
Range
3W
Section
1
Other Location Info
186 Summit Dr

Notice of Determination

Approving Agency
County of Santa Cruz
Approving Agency Role
Lead Agency
Approved On
County Clerk
Santa Cruz
Final Environmental Document Available at
https://cdi.santacruzcountyca.gov/UPC/GetInvolved/CEQAInitialStudiesEIRs/CEQADocumentsOpenforPublicReview.aspx , 701 Ocean St 4th Floor, Santa Cruz CA

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV New Search Print