Hazel M. Bailey Primary School Expansion Project

2 Documents in Project

Summary

SCH Number
2024110924
Lead Agency
Firebaugh-Las Deltas Unified School District
Document Title
Hazel M. Bailey Primary School Expansion Project
Document Type
NOD - Notice of Determination
Received
Posted
11/17/2025
Document Description
The proposed Project would include the construction of seven new buildings ranging from 2,840 square feet to 5,705 square feet. The seven new buildings would contain 14 new classrooms in total. Figure 3 shows the proposed site plan including existing buildings and the proposed new classroom buildings. The new buildings proposed by the District would be used as transitional kindergarten classrooms to accommodate existing student capacity and would not increase enrollment. The proposed Project would also include a new fire lane with the addition of two fire hydrants connecting to an offsite fire hydrant and the addition of new concrete walkways throughout the site. Existing turf and planter areas on the Project site would be rehabilitated as part of the Project. The Project would include the installation of new signage and accessibility features including an accessible drinking fountain and accessible chain link gate. Several trees, curb cut ramps and portions of chain link fence would be removed for new construction and site improvements. No existing structures would be demolished as a result of the Project.

Contact Information

Name
Troy Cox
Agency Name
Firebaugh Las-Deltas Union School District
Job Title
Superintendent
Contact Types
Lead/Public Agency

Location

Cities
Firebaugh
Counties
Fresno
Regions
Citywide
Cross Streets
Q Street and Saipan Avenue
Zip
93622
Total Acres
14
Parcel #
008-020-63T, 008-020-66T, 008-020-64T
State Highways
State Route 33
Railways
Union Pacific Railroad
Airports
Firebaugh Airport
Schools
Hazel M. Bailey
Waterways
San Joaquin River

Notice of Determination

Approving Agency
Firebaugh Las-Deltas Union School District
Approving Agency Role
Lead Agency
Approved On
County Clerk
Fresno
Final Environmental Document Available at
https://www.fldusd.org/apps/pages/index.jsp?uREC_ID=930205&type=d&pREC_ID=2718384

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV New Search Print