San Luis West Solar Project
4 Documents in Project
Summary
SCH Number
2024110679
Lead Agency
Fresno County
Document Title
San Luis West Solar Project
Document Type
NOD - Notice of Determination
Received
Posted
11/5/2026
Document Description
Allow the construction and operation of the San Luis West Solar Project. The Project will consist of a 125-megawatt (MW) solar photovoltaic (PV) electric generation facility, a new substation, an estimated 30 MW battery energy storage system (BESS) and the ultimate decommissioning of a photovoltaic electricity generating facility. The PV portion of the facility will produce electricity by way of the photovoltaic effect, which uses a semi-conductor material to convert photons from the Sun into electrons, for injection into the electrical grid operated by PG&E. The BESS portion of the facility will store electricity either generated by the PV arrays or absorbed from the PG&E grid. In either case, the BESS will make the stored energy available for discharge during periods of peak electrical load. The Project facility includes approximately 770 acres of solar panels and associated infrastructure, the Project substation, BESS, an operations and maintenance (O&M) building, and other associated equipment such as overhead and underground medium voltage collection lines. Project infrastructure will also include approximately 10 additional acres of transmission easement areas for underground and overhead medium voltage collection lines situated along and within existing farm roads. The Project Area, which encompasses all areas of temporary and permanent impacts, is approximately 1,100 acres
Contact Information
Name
Alyce Alvarez
Agency Name
Fresno County
Job Title
Planner
Contact Types
Lead/Public Agency
Address
Phone
Name
Megan McMullen
Agency Name
San Luis West Solar, LLC
Job Title
Project Manager
Contact Types
Project Applicant
Phone
Location
Cities
Huron
Counties
Fresno
Regions
Northern California, Unincorporated
Other Location Info
The Project Area is located in a rural area of Fresno County approximately 3 miles south of Huron, California. The Project Area is south of West Tractor Avenue, west of the California Aqueduct, and east of Interstate 5 (I-5).. The Project Area extends to the south and approximately 3 miles due east of the Pacific Gas & Electric (PG&E) Gates Substation, which is located at the intersection of South Trinity Avenue and West Jayne Avenue. (APNs: 075-070-54S, 078-060-85S, 078-080-55, 085-050-01S, 085-050-47S, 085-050-48S, 085-050-84S) (Sup. Dist. 4).
Notice of Determination
Approving Agency
Fresno County Planning Commissioin
Approving Agency Role
Lead Agency
Approved On
County Clerk
Fresno
Final Environmental Document Available at
fresnocountyca.gov
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.