Yuba River Development Project and the Narrows Hydroelectric Project FERC Relicensings

2 Documents in Project

Summary

SCH Number
2024101277
Lead Agency
Yuba County Water Agency
Document Title
Yuba River Development Project and the Narrows Hydroelectric Project FERC Relicensings
Document Type
EIR - Draft EIR
Received
Present Land Use
Timberland Preserve, Forest, Agricultural, Rural Residential, Rural, Recreational
Document Description
The YRDP is located in Yuba, Sierra and Nevada Counties, on the main stems of the Yuba River, the North Yuba River and the Middle Yuba River, and on Oregon Creek, a tributary to the Middle Yuba River. The Narrows Project is located near Englebright Dam in unincorporated Nevada County. Yuba Water has applied for relicensing of both the YRDP and the Narrows Project to the Federal Energy Regulatory Commission (FERC), each for a 50-year term, that would allow for the continued operations and maintenance of the existing YRDP and Narrows Project hydropower facilities. As part of the new license, the YRDP proposes to construct a new Tailwater Depression System at the New Colgate Powerhouse, install outlet pipes at the Our House and Log Cabin Diversion Dams, and replace an existing gate at the Lohman Ridge Diversion Tunnel connecting the two diversion dams. The YRDP also proposes to improve existing recreation facilities at New Bullards Bar Reservoir, plus add two new campground areas, a picnic site, and a trail. Yuba Water does not propose any changes to the existing Narrows Project works or facilities, and no new facilities are proposed. Both projects would have changes to license conditions affecting issues such as biological resources and cultural resources.

Contact Information

Name
John James
Agency Name
Yuba Water Agency
Job Title
Director of Resource Planning
Contact Types
Lead/Public Agency

Location

Cities
Marysville
Counties
Nevada, Sierra, Yuba
Regions
Countywide
Cross Streets
Marysville Road
Zip
95901
Total Acres
1500
State Highways
49
Waterways
Yuba River, New Bullards Bar Reservoir

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Conservation (DOC), California Department of Fish and Wildlife, North Central Region 2 (CDFW), California Department of Forestry and Fire Protection (CAL FIRE), California Department of Parks and Recreation, California Department of Resources Recycling and Recovery, California Department of State Parks, Division of Boating and Waterways, California Department of Toxic Substances Control (DTSC), California Department of Transportation, District 3 (DOT), California Department of Water Resources (DWR), California Energy Commission, California Fish and Game Commission (CDFGC), California Governor's Office of Emergency Services (OES), California Highway Patrol (CHP), California Native American Heritage Commission (NAHC), California Natural Resources Agency, California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, Central Valley Sacramento Region 5 (RWQCB), California State Lands Commission (SLC), Central Valley Flood Protection Board, Delta Protection Commission, Delta Stewardship Council, Office of Historic Preservation, State Water Resources Control Board, Division of Drinking Water, State Water Resources Control Board, Division of Water Quality, State Water Resources Control Board, Division of Water Rights, State Water Resources Control Board, Divison of Financial Assistance
Development Types
Recreational (New and upgraded campgrounds and boat launches), Power:Hydroelectric (Megawatts 360)
Local Actions
FERC Relicensing
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Greenhouse Gas Emissions, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Noise, Public Services, Recreation, Transportation, Tribal Cultural Resources, Vegetation
Public Review Period Start
Public Review Period End

Attachments

Notice of Completion [NOC] Transmittal form

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV Download All Attachments New Search Print