Semitropic Capital Preventative Maintenance (CAPM) Project (Lake or Streambed Alteration Agreement No. EPIMS-KER-61659-R4)

4 Documents in Project

Summary

SCH Number
2024090686
Lead Agency
California Department of Transportation, District 6 (DOT)
Document Title
Semitropic Capital Preventative Maintenance (CAPM) Project (Lake or Streambed Alteration Agreement No. EPIMS-KER-61659-R4)
Document Type
NOD - Notice of Determination
Received
Posted
3/10/2026
Document Description
The California Department of Fish and Wildlife (CDFW) has executed Lake or Streambed Alteration Agreement (EPIMS-KER-61659-R4), pursuant to Fish and Game Code section 1602, to the project Applicant, California Department of Transportation (Caltrans). The Project includes activities related to rehabilitating the existing bridge concrete abutments at the two Project locations, as well as vegetation removal, minor grading for construction access, and installing erosion control treatments.

Contact Information

Name
Judith Lopez
Agency Name
Caltrans
Job Title
Lead Agency
Contact Types
Lead/Public Agency

Name
Mindy Trask
Agency Name
CDFW
Job Title
Senior Environmental Scientist, Specialist
Contact Types
Responsible Agency

Location

Counties
Kern
Regions
Southern California
State Highways
SR 46
Other Location Info
The Project is located on State Route (SR) 46 at highway post mile (PM) 34.63 (Main Drain Canal) and PM 35.15 (Goose Lake Canal) in Kern County, California.

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV New Search Print