Three Palms Mobile Home Park Wastewater Collection and Disposal Project
3 Documents in Project
Summary
SCH Number
2024070976
Lead Agency
City of Fresno
Document Title
Three Palms Mobile Home Park Wastewater Collection and Disposal Project
Document Type
NOD - Notice of Determination
Received
Posted
1/21/2026
Document Description
The proposed Project includes the abandonment or removal of approximately 20 existing septic systems, installation of 1 lift station, installation of approximately 3,000 linear feet of 6-inch diameter gravity sewer main, installation of 102 sewer service lateral connections to the new internal 6-inch main, and installation of approximately 15 on-site manholes as shown in Figure 2. The minimum depth of the pipe would be 3-feet, and the trench would be cut through either paved or previously disturbed areas. The connection to the City’s sewer collection system would be made by either trenching or boring across N Golden State Boulevard. This would be contingent upon criterion such as safety and economic viability. This connection would consist of removing and reconstructing the existing City manhole adjacent to the north-bound travel lane of Golden State Boulevard
Contact Information
Name
Debbie Khounsavath
Agency Name
City of Fresno Department of Public Utilities
Job Title
Project Manager
Contact Types
Lead/Public Agency
Address
Phone
Location
Coordinates
Cities
Fresno
Counties
Fresno
Regions
Citywide, Countywide
Cross Streets
N. Golden State Boulevard and W. McKinley
Total Acres
9.8
Parcel #
442-122-26
State Highways
State Highway 99
Railways
Southern Pacific Railroad
Notice of Determination
Approving Agency
City of Fresno - Department of Public Utilities
Approving Agency Role
Lead Agency
Approved On
County Clerk
Fresno
Final Environmental Document Available at
1626 E. Street, Fresno, CA 93706
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.
