GEORGIANA SLOUGH EROSION CONTROL AND HABITAT ENHANCEMENT PROJECT
2 Documents in Project
Summary
SCH Number
2024061227
Lead Agency
Brannan-Andrus Levee Maintenance District
(BALMD)
Document Title
GEORGIANA SLOUGH EROSION CONTROL AND HABITAT ENHANCEMENT PROJECT
Document Type
NOD - Notice of Determination
Received
Posted
3/27/2025
Document Description
The Brannan-Andrus Levee Maintenance District (BALMD) is proposing the Georgiana Slough Erosion Control and Habitat Enhancement Project to resolve upper slope erosion problems and a major lower slope undercutting issue along the right bank levee of Georgiana Slough, on Lower Andrus Island. The Proposed Project would involve construction of proven erosion control methods involving placement
of quarry stone rip rap (or rock slope protection - RSP) at the toe of the levee, which doubles as a foundational base for a habitat bench that will be constructed along the entire length. Once completed, the Project would provide suitable erosion control to the levee utilizing recognized and effective erosion control methodologies and support fish-friendly habitat through the creation of wetland and riparian shaded riverine aquatic (SRA) habitat on the channel margin.
Contact Information
Name
Emily Pappalardo
Agency Name
Brannan-Andrus Levee Maintenance District
Job Title
District Engineer
Contact Types
Lead/Public Agency
Phone
Email
Name
Debbie Phulps
Agency Name
Brannan-Andrus Levee Maintenance District
Job Title
Secretary
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Counties
Sacramento
Regions
Countywide, Northern California, Unincorporated
Cross Streets
Sacramento County, Right bank of Georgiana Slough 1/4 mile upstream of Mokelumne River
Zip
95690
State Highways
Hwy 12
Waterways
Georgiana Slough, Mokelumne River
Notice of Determination
Approving Agency
Brannan-Andrus Levee Maintenance District
Approving Agency Role
Lead Agency
Approved On
County Clerk
Sacramento
Final Environmental Document Available at
https://balmd.org/announcements-levee-maintenance-district.html
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.