Greenwood Beach Restoration Project (Lake or Streambed Alteration Agreement No. EPIMS-MAN-56081-R3)
4 Documents in Project
Summary
SCH Number
2024061144
Lead Agency
City of Tiburon
Document Title
Greenwood Beach Restoration Project (Lake or Streambed Alteration Agreement No. EPIMS-MAN-56081-R3)
Document Type
NOD - Notice of Determination
Received
Posted
6/6/2025
Document Description
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement (EPIMS-MAN-56081-R3), pursuant to Fish and Game Code section 1602, the project Applicant, David Eshoo/Town of Tiburon.
The purpose of the project is to restore and enhance Greenwood and Brunini Beaches using nature-based, living shoreline solutions to reduce rates of shoreline erosion, improve shoreline habitat and recreational values, and improve shoreline sea level rise resilience. The project activities subject to the Streambed Alteration Agreement are limited to placement of cobble armored salt marsh along the top of the west bank of the unnamed flood control channel at its confluence with Richardson Bay and construction of a low-flow bypass channel to ensure estuarine fish movement between the flood control channel and the tidal flats of Richardson Bay.
Contact Information
Name
Tami Schane
Agency Name
CA Department of Fish and Wildlife
Job Title
Environmental Scientist
Contact Types
Responsible Agency
Phone
Name
David Eshoo
Agency Name
Town of Tiburon
Job Title
Lead Agency Contact
Contact Types
Lead/Public Agency
Phone
Location
Cities
Tiburon
Counties
Marin
Regions
San Francisco Bay Area
Other Location Info
The proposed project site is located along an unnamed flood control channel the drains from Ring Mountain and enters Greenwood and Brunini Beaches on the Shoreline of Richardson Bay (near Blackie’s Pasture).
Notice of Determination
Approving Agency
CA Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Marin
Final Environmental Document Available at
The Mitigated Negative Declaration prepared for the project is available to the general public at the office location listed above for the Lead Agency. CDFW’s record of project approval as a Responsible Agency is available at CDFW’s regional office.
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.