State Route (SR)-18 CAPM, Culvert Repair, Guardrail Upgrade
6 Documents in Project
Summary
SCH Number
2024051063
Lead Agency
California Department of Transportation, District 8
(DOT)
Document Title
State Route (SR)-18 CAPM, Culvert Repair, Guardrail Upgrade
Document Type
NOD - Notice of Determination
Received
Posted
7/6/2026
Document Description
The Project includes: culvert repair; installation or replacement of rock slope protection at some culvert outlets; and concrete lining of the bed and banks of the Cushenberry Creek bridge crossing (postmile 66.9) to meet hydraulic clearance standards. In addition, the Project will rehabilitate portions of SR-18 with road surface improvements, guardrail systems upgrades, rumble strip installation, signage replacement, and shoulder widening.
Contact Information
Name
Devin Jokerst
Agency Name
State Water Resources Control Board
Job Title
Environmental Scientist
Contact Types
Responsible Agency
Phone
Name
Adam Compton
Agency Name
California Department of Transportation, District 8
Job Title
Branch Chief – Environmental Regulatory Permits
Contact Types
Lead/Public Agency
Phone
Email
Location
Cities
Big Bear
Counties
San Bernardino
Regions
Unincorporated
Cross Streets
SR-18, postmiles 56.2 to 66.9
Notice of Determination
Approving Agency
State Water Resources Control Board
Approving Agency Role
Responsible Agency
Approved On
County Clerk
San Bernardino
Final Environmental Document Available at
https://ceqanet.lci.ca.gov/2024051063/4
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.
