Bits of Things Timber Harvesting Plan 4-23-00158-ELD (Streambed Alteration Agreement EPIMS Notification No. EPIMS-ELD-47863-R2)

2 Documents in Project

Summary

SCH Number
2024030350
Lead Agency
California Department of Forestry and Fire Protection (CAL FIRE)
Document Title
Bits of Things Timber Harvesting Plan 4-23-00158-ELD (Streambed Alteration Agreement EPIMS Notification No. EPIMS-ELD-47863-R2)
Document Type
NOD - Notice of Determination
Received
Posted
8/27/2025
Document Description
The California Department of Fish and Wildlife (CDFW) has executed the amendment to Streambed Alteration Agreement EPIMS Notification Number EPIMS-ELD-47863-R2, pursuant to section 1611 of the Fish and Game Code to the project Applicant, Sierra Pacific Industries. The project is limited to the change in location of work point 4 and the installation of a temporary skid crossing instead of a permanent rock-armored crossing. Further explanation of work can be referenced within the THP 4-23-00158-ELD Amendment 1.

Contact Information

Name
Carlee Cockrum
Agency Name
Department of Fish and Wildlife
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Name
Yanik Zuluaga
Agency Name
Department of Forestry and Fire Protection
Job Title
Forester II
Contact Types
Lead/Public Agency

Location

Counties
El Dorado
Regions
Northern California
Other Location Info
The projects are located within the boundaries of a timber harvesting plan in El Dorado County, within CALWATER watersheds Ice House Reservoir and Carpenter Creek and their connecting tributaries; Township 11N, Range 15E, Sections 4, 5, 8, 10, 11, and 15, Township 11N, Range 14E, Section 12 and 13, and Township 11N, Range 16E, Section 18 U.S. Geological Survey (USGS) Quad Maps Kyburz and Pyramid Peak; Mount Diablo Base and Meridian.

Notice of Determination

Approving Agency
Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Timber Harvesting Plan)
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV New Search Print