28th Street Storm Drain Infiltration Project (Addendum)
5 Documents in Project
Summary
SCH Number
2024020618
Lead Agency
City of Manhattan Beach
Document Title
28th Street Storm Drain Infiltration Project (Addendum)
Document Type
NOD - Notice of Determination
Received
Posted
5/28/2026
Document Description
The City is proposing to construct the 28th Street Storm Drain Infiltration Project. Runoff will be diverted from the existing County-owned storm drain located below 28th Street through a pipe aligned southeast on Manhattan Avenue. The diverted runoff will be pumped to a trash removal device and sedimentation system (pretreatment) to remove trash and sediment and then distributed to a matrix of drywells located in and around the parking facility. This NOD concerns an Addendum to the previously adopted MND.
Contact Information
Name
Gilbert Gamboa
Agency Name
City of Manhattan Beach
Job Title
City Engineer
Contact Types
Project Applicant
Phone
Location
Cities
Manhattan Beach
Counties
Los Angeles
Regions
Citywide, Southern California
Cross Streets
Manhattan Ave & 28th Street
Zip
90266
State Highways
California
Waterways
28th Street Stormwater Infiltration
Township
Manhat
Notice of Determination
Approving Agency
City of Manhattan Beach
Approving Agency Role
Lead Agency
Approved On
County Clerk
Los Angeles
Final Environmental Document Available at
City of Manhattan Beach
Engineering Division
1400 Highland Ave., Manhattan Beach, Ca 90266
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.
