Minor Alteration No. WA2026105 – Dry Creek Parkway Trail Phase 2 Project: Borings on Dry Creek
4 Documents in Project
Summary
SCH Number
2024010313
Lead Agency
Sacramento County
Document Title
Minor Alteration No. WA2026105 – Dry Creek Parkway Trail Phase 2 Project: Borings on Dry Creek
Document Type
NOD - Notice of Determination
Received
Posted
9/28/2026
Document Description
Approval of Minor Alteration WA2026105, under California Code of Regulations, Title 23, Article 3, Section 6, for work within an adopted plan of flood control: To perform twenty-nine borings, ranging from four to eight inches in diameter and five to 100 feet deep. The holes will be closed and backfilled with tremie neat cement grout and the top one to two feet will be native soil to return the area back to its original condition.
Contact Information
Name
Angela R Nguyen-Tan
Agency Name
Central Valley Flood Protection Board
Job Title
Senior Environmental Scientist
Contact Types
Responsible Agency
Phone
Name
David Markowski
Agency Name
Sacramento County Department of Transportation
Job Title
Project Liaison
Contact Types
Project Applicant / Parties Undertaking Project
Phone
Email
Name
Anastasia Shippey
Agency Name
Sacramento County
Job Title
Planner
Contact Types
Lead/Public Agency
Phone
Email
Location
Coordinates
Cities
sacra, Sacramento
Counties
Sacramento
Regions
Northern California
Other Location Info
The proposed project is located along the Dry Creek Designated Floodway just south of the Sacramento-Placer County line, at approximately 38.70557 N, -1521.41129 W; in Sacramento County.
Notice of Determination
Approving Agency
Central Valley Flood Protection Board
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Sacramento
Final Environmental Document Available at
The MND, prepared by the lead agency for the project, is available to the general public at the lead agency’s office listed above. The Board’s administrative record related to the Board authorization is available for public review at the Board’s office.
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.
